Laserfiche WebLink
MONITGRING SYSTEM CERTIF <br />CERTIFICATION / TEST DATE: <br />Al. FACILITY <br />Name Colonial Energy #40135 <br />Address 192 Lathrop Road, Lathrop, CA 95330 <br />Phone # 209-858-4998 <br />Contact Station Manager <br />IN -TANK GAUGING / SIR EQUIPMENT: <br />TION <br />2016 JAN 11 20io <br />A2. OWNER -'mIE'i191pAir Ns''r. <br />Name Colonial Energy, LLC. LIMAI-ru nr_oa�sxr.rcnt- <br />Address 2860 N. Santiago Blvd. 2nd Floor, Orange, CA 92867 <br />Phone # 714-761-5426 <br />Contact Victor Hassan <br />■ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No' <br />Has all Input wiring been inspected for proper entry and termination, including testing k <br />❑ <br />Yes <br />❑ <br />No' <br />Were all tank gauging probes visually Inspected for damage and residue buildup? <br />❑ <br />Yes <br />EYNo' <br />❑ No' <br />■ N/A <br />Was accuracy of system product level readings tested? <br />_ ❑ <br />Yas <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />❑ <br />❑ <br />Yes <br />Yes <br />❑ <br />❑ <br />No' <br />No' <br />Were all probes reinstalled properly? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />' In Section H below, describe how and when these deficiencies were or will be corrected. <br />IG. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />,,, �.,..,, n uoiuw, ueacnue now ane widen mese eenclencies were or will be corrected. <br />H. COMMENTS <br />Page 3 of 3 <br />■ Yes <br />❑ No • <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(check al/ that apply) Simulated leak rate: ■ 3g,p.h.; ❑ 0.1 g.p.h.; ❑ 0.2g.p.h. <br />■ Yes <br />❑ No . <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ Yes <br />❑ No • <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No' <br />■ N/A <br />For mechanical LLDs, does the LLD restrict product flow if It detects a leak? <br />■ Yes <br />❑ No ` <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off If the LLD detects a leak? <br />■ Yes <br />❑ No' <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system Is disabled <br />or disconnected? <br />■ Yea <br />❑ No' <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />or fails a test? <br />■ Yes <br />❑ No • <br />❑ N/A <br />For electronic LLDs, have all accessible wiring connections been visually Inspected? <br />■ Yes <br />❑ No ` <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />,,, �.,..,, n uoiuw, ueacnue now ane widen mese eenclencies were or will be corrected. <br />H. COMMENTS <br />Page 3 of 3 <br />