Laserfiche WebLink
MONITORING SYSTEM CERTI <br />CERTIFICATION / TEST DATE: <br />Al. FACILITY <br />Name Colonial Energy #40135 <br />Address 192 Lathrop Road, Lathrop, CA 95330 <br />Phone # 209-858-4998 <br />Contact Station Manager <br />F. IN -TANK GAUGING / SIR EQUIPMENT: <br />RECEIVE <br />TION JAN 04 2016 <br />17, 2015 <br />A2. OWNER I I V EZ <br />Name Colonial Energy, LLC. <br />Address 2860 N. Santiago Blvd. 2nd Floor, Orange, CA 92867 <br />Phone# 714-761-5426 <br />Contact Victor Hassan <br />■ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No* <br />Has all Input wiring been Inspected for proper entry and termination, Including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all tank gauging probes visually Inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />❑ <br />❑ <br />Yes <br />Yes <br />❑ <br />❑ <br />No . <br />No • <br />Were all probes reinstalled property? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H below, describe how and when these deficiencies were or will be corrected. <br />LINE LEAK DETECTORS (LLD): <br />Complete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />Page 3 of 3 <br />■ <br />Yes <br />❑ <br />❑ <br />No. <br />N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(check all that apply) Simulated leak rare: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />■ <br />Yes <br />❑ <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ <br />Yes <br />❑ <br />No' <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />■ <br />NO' <br />WA <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />■ Yes <br />❑ No' <br />❑ WA <br />■ <br />Yes <br />❑ <br />❑ <br />No' <br />WA <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system Is disabled <br />or disconnected? <br />■ <br />Yes <br />❑ <br />❑ <br />No' <br />N/A <br />For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system malfunctions <br />or fails a test? <br />■ <br />Yes <br />❑ <br />❑ <br />No' <br />N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Were all Items on the equipment manufacturer's maintenance checklist completed? <br />■ Yes <br />❑ No' <br />In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />Page 3 of 3 <br />