My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 12:57:00 PM
Creation date
11/5/2018 4:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\192\PR0505867\COMPLIANCE INFO 2016 - JUNE 2017.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING SYSTEM CERTIFICATION <br /> CERTIFICATION / TEST DATE: January4, 2017 <br /> At. FACILITY A2. OWNER <br /> Name Colonial Energy#40135 Name Colonial Energy,LLC. <br /> Address 192 Lathrop Road,Lathrop,CA 95330 Address 2860 N.Santiago Blvd.2nd Floor,Orange,CA 92867 <br /> Phone 209-858-4998 Phone# 714-761-5426 <br /> Contact Station Manager Contact Victor Hassan <br /> F. IN-TANK GAUGING I SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all Input wiring been Inspected for proper entry and termination,including testing for ground faults <br /> ❑ Yes ❑ No* Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> ` In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ■ Yes ❑ No" For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ NIA (check all that apply) Simulated leak rote: ■ 3g.p.h.; [:10.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ■ Yes [1No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ■ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if It detects a leak? <br /> ■ NIA <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ■ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system is disabled <br /> ❑ NIA or disconnected? <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> ■ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually Inspected? <br /> ❑ N/A <br /> ■ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> Li <br /> AN 2 2 2018 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> 2017 Walton Engineering,Inc. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.