Laserfiche WebLink
I -WRING SYSTEM CERTOCATION <br />CERTIFICATION /TEST DATE: January7 2015 <br />Al. FACILITY <br />A2. OWNER <br />Name Tower Mart # 104 <br />Name Tower Energy Group, Inc. <br />Address 192 Lathrop Road, Lathrop, CA 95330 <br />Phone # 209-858-4998 <br />Address 1983 West 190th Street, Torrance, CA 90504 <br />Phone # 916-285-7402 ext 100 <br />Contact Desiz Burns <br />Contact Mark Vasey <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />FYesYes <br />❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No' Were all tank gauging probes visually Inspected for damage and residue buildup? <br />❑ Yes ❑ No' Was accuracy of system product level readings tested? <br />❑ Yes ❑ No' Was accuracy of system water level readings tested? <br />❑ Yes ❑ No' Were all probes reinstalled properly? <br />❑ Yes ❑ No' Were all Items on the equipment manufacturers maintenance checklist completed? <br />In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />■ Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verily LLD performance? <br />❑ N/A (Cheek all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />■ Yes <br />❑ No' <br />Were ail LLDs confirmed operational and accurate within regulatory requirements? .. <br />■ Yes <br />❑ No' <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No' <br />For mechanical LLDs, does the LLD restrict product flow If It detects a leak? <br />■ NIA <br />■ Yes <br />❑ No' <br />For electronic LLDs, does the turbine automatically shut off H the LLD detects a leak? <br />❑ NIA <br />■ Yes <br />❑ No' <br />For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system Is disabled <br />❑ N/A <br />or disconnected? <br />■ Yes <br />❑ No" <br />For electronic LLDs, does the turbine automatically shut off H any portion of the monitoring system malfunctions <br />❑ WA <br />or falls a test? <br />■ Yes <br />❑ No' <br />For electronic LLDs, have all accessible wiring connections been visually Inspected? <br />❑ NIA <br />i, <br />■ Yes <br />❑ No' <br />Were all Items on the equipment manufacturers maintenance checklist completed? <br />' In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />87-1 and 87-2 are line manifolded with a single ELLD. <br />Page 3 of 3 <br />