I, COORDINATE WITH LOCAL AGENCIES <br /> A, DESIGN PHASE (PROJECT ENGINEER'S RESPONSIBILITY) <br /> 1, OBTAIN INSTALLATION PERMIT <br /> 2, OBTAIN FIRE PERMIT <br /> 3, SUBMIT PLANS FOR REVIEW (PLAN CHECK) TO ALL APPROPRIATE <br /> AGENCIES <br /> 4, PERFORM REQUESTED DESIGN MODIFICATIONS <br /> B, CONSTRUCTION PHASE (CONTRACTORS RESPONSIBILITY) <br /> 1, ARRANGE INSPECTIONS AND SITE VISITS BY LOCAL AGENCIES <br /> 2, OBTAIN "JOB CARD" (IF REQUIRED) <br /> 3, OBTAIN OPERATIONAL PERMIT <br /> 4, OBTAIN AIR QUALITY PERMIT FOR BOTH EAG & TANK (REQUIRED FOR ANY <br /> TANK THAT'S 250 GALLONS OR GREATER AND A SEPARATE PERMIT FOR ANY <br /> EAG 50HP OR GREATER IN SOUTH COAST BASIN) <br />