Laserfiche WebLink
UST INSTALLATION PROCEDURE <br /> I, COORDINATE WITH LOCAL AGENCIES IN BOTH THE DESIGN AND CONSTRUCTION <br /> PHASES <br /> II. INSTALL TANK, PIPING, SUMPS AND ALL ASSOCIATED MATERIALS, IN ACCORDANCE <br /> WITH MANUFACTURERS INSTRUCTION <br /> A. CERTIFY RESIDENT ENGINEERS IN INSTALLATION PROCEDURES <br /> B, USE ONLY UST MANUFACTURER APPROVED INSTALLATION CONTRACTORS <br /> III, THOROUGHLY TEST ALL PRIMARY AND SECONDARY PIPING BEFORE BACK FILLING <br /> IV. PERFORM LEAK DETECTION AND INTERCEPTION FULL SYSTEM TEST, UNDER THE <br /> DIRECTION OF THE LOCAL REGULATORY AGENCY <br />