Laserfiche WebLink
F"EB.25.2003 9:42AM SCOTT CO NO.607 P.5/11 <br /> SWRCB,January 2002 Page of <br /> 6. PIPL 'G SUMP TESTING <br /> Test Mdthod Developed By: Sump Manufacturer industry Standard Professional Eugia <br /> Other(Spec) <br /> 'fest Method[Jsed: Pressure Vacuum Oydrastatl <br /> Other(Spec) <br /> Fest Equipment Used: IK Equipment Resolution: <br /> + � ,i '. �r � I�� k��rl ,Sump# Sump# Sump'# Sump# <br /> Sump Diameter; 4t <br /> Sump Depth: AO <br /> Sump Material: r654 <br /> Height from Tank Top to Top of E+ 1 <br /> Hi est PipjuiZ Penetration: <br /> HekhT from Tank Top to Lowest 1 u <br /> Electrical Peactration: <br /> Condition of sump,prior to testing: { <br /> Portion of Sump Tested' 1 " <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Y s No NA Yes No NA Yes No NA Yes No NA <br /> roduct and water)?` <br /> Turbine shutdown response time i <br /> Is system progm=ed for fall-safe ,c No NA Yes No NA Yes No NA Yes No NA <br /> shutdown?' G <br /> Was fail-safe verified to be es No NA 'Yes No NA Yes No NA Yes No NA <br /> operational? <br /> Wait time between applying <br /> pressure/vacuumlwater and starting <br /> test: I <br /> Test Stan Time: <br /> Initial Reading(AD: � <br /> Test End Time: r <br /> Final Reeding(RF): <br /> Test Duration: 1 M,%.A <br /> Change in Reading CRF-Rr): +'o;m <br /> Pss3/Fail Threshold or Criteria: <br /> Test Result. Pass Q Fail 0 gauss. 0 F-A4 Q Peery .n'hil q Pass 0 Fail <br /> Was sensor removed for testis? !� cs No NA Yes No NA Yes Na NA Yes No NA <br /> Was sensor properly replaced and No NA Yes NoNA I Yes No NA Yes Na NA <br /> verified f motion} after testing? <br /> Comments — (include information on repairs madeprior to testing and recomfnended ello-o u far ailed tesrs) <br /> ' If the entire depth of the sump is not Sested, specify how m.lich was tested. if the answer to +of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (Seo SWRCB LO-160) <br />