Laserfiche WebLink
FEB.25.2003 9:42RM SCOTT CO NO.607 P.4/11 <br /> • SUVRC$,January 2002 . <br /> PAAe of <br /> S. SECONDARY P rPE TESTING <br /> Test Method Developed By: Piping M,=ufacturer Indusuy Standard ProfessiorA Engineer <br /> Other(Specify) <br /> Test Md hl Used: Pressure Vacuum Hydrostatic <br /> Other(Sped) <br /> Test Equipment Used: Equipment Resolu1. ti11 on: <br /> t Pi sn Run# Piping Run## Piping Run# Piping Run# <br /> Piping Material: IAts s <br /> Piping Manufac== 40 <br /> - <br /> Piping Diameter: }+ <br /> Length of Pipinu Run: <br /> Product Stored: <br /> Method and locarion of <br /> piping-ran isolation: <br /> Wait time bameen applying <br /> pressurm/vacuum/water and <br /> sra-dn-test' <br /> Test Start Tune; <br /> Initial'Reading(Rl): <br /> Test End Time: <br /> Final Reading(FF): <br /> Test Duration: <br /> Change in Reading(RF-R;): <br /> Pass/Fail Tbreshold or <br /> Test result: `R Paz& 'Q.,R il' <br /> Comments-- (include information on re airs made pylor to testing, and recommended ollow-u or Failed tears <br />