My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDBERGH
>
6364
>
2300 - Underground Storage Tank Program
>
PR0507806
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 11:40:05 AM
Creation date
11/5/2018 5:11:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0507806
PE
2361
FACILITY_ID
FA0007770
FACILITY_NAME
ATLANTIC AVIATION
STREET_NUMBER
6364
STREET_NAME
LINDBERGH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
6364 LINDBERGH ST 202
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDBERGH\6364\PR0507806\INSTALL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Retestable containment <br />piping <br />Fig. 6. Wall penetrations can be made using <br />flexible test boots and fiberglass centralizers. <br />The 90° centralizers are adhesive bonded <br />inside the 3 -inch fiberglass containment pipe <br />at the 3 o'clock and 9 o'clock positions in <br />accordance with the instructions contained <br />in Ameron publication FP535 (B revision or <br />later). The centralizers ensure free drainage <br />from the annular space between the primary <br />and secondary and serve to reduce side <br />loading on the test boot. Adhesive bonding <br />of the centralizers to the containment pipe is <br />necessary to maintain them in the proper <br />position under actual service conditions <br />where movement of the flexible piping <br />may occur. <br />Fig. 7. Air -line assemblies join runs entering <br />and leaving dispenser pans, thus permitting <br />all the annular spaces for a given product line <br />to be pressure tested simultaneously. <br />Permanent retestabr'lity of the lines can be <br />provided by installing copper tubing or the <br />equivalent in lieu of the temporary air -line <br />assemblies. <br />FLEXIBLE PIPING <br />Dualoy 3000/FLX 11111/2 - <br />inch (ID) primary piping is <br />delivered to the job site In <br />coils of 500 feet. End <br />connectors are swaged <br />onto the primary piping <br />at the job site. Once in <br />place, the end <br />connectors are capable <br />of both circumferential <br />and axial movement for <br />easier installation and <br />make-up. The length of <br />the end connectors <br />figures into the calculation of <br />the overall length for any <br />given run of pipe. <br />RIGID -WALL PIPE AND FITTINGS <br />Dualoy 3000/1- rigid -wall pipe <br />and fittings are used to <br />contain Dualoy 3000/F LX II <br />flexible primary piping and in <br />singie-wall vent and vapor <br />recovery lines. Rigid -wall <br />piping materials include the <br />following: <br />• Three-inch Dualoy 3000/L <br />rigid -wall fiberglass pipe <br />for containment piping. <br />• Three-inch 90° or <br />45° sweep containment <br />Provide sufficient insertion of -1• r <br />secondary pipe to facilitate <br />installation of closure boot <br />Small end of closure boot may Two 9d° fiberglass <br />be iccated directly on swivel centralizers bonded <br />end by removing bushing inside containment pipe <br />Important notice This literature and the information and recommendations it contains are based on data reasonably <br />beiieved to be reliable. However, such factors as variations In environment, application or instal- <br />lation, changes in operating procedures, or extrapolation of data may cause different results. <br />Ameron makes no representation or warranty, express or implied, including warranties of <br />merchantability or fitness for purpose, as to the accuracy, adequacy or completeness of the <br />recommendations or information contained herein. Ameron assumes no liability whatsoever in <br />connection with this literature orthe information or recommendations it contains. <br />mmepone <br />Fiberglass pipe Group <br />P.O. Box 801148 <br />Flouston TX 77280 <br />Tel: (713) 690-7777 <br />Fax: (713) 690-2842 <br />Fiberglass Pipe Division <br />Europe <br />J.F. Kennedylaan 7 <br />4191 MZ Geldermalsen <br />The Netherlands <br />Tel: +31345 573 341 <br />Fax: +31345 575 254 <br />Telex: 40257 bonds ni <br />Fiberglass Pipe Division <br />The Americas <br />P.O. Box 878 <br />Burkburnett, Texas 76354 <br />USA <br />Tei: (817) 569-1471 <br />Fax: (817) 569-4012 <br />Fiberglass Pipe Division <br />Asia <br />No. 7A, Tuas Avenue,3 <br />Singapore 2263 <br />Tel: 862-1301 <br />Telex: 38960 AMERON RS <br />Fax: 862-1302 <br />C 1993 Ameron FP539B (5196) supersedes FP539A (8195) Printed in U.S.A. 5M 11861 <br />
The URL can be used to link to this page
Your browser does not support the video tag.