My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2300 - Underground Storage Tank Program
>
PR0231158
>
COMPLIANCE INFO 2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 11:57:53 AM
Creation date
11/5/2018 5:15:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2013
RECORD_ID
PR0231158
PE
2361
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDSAY\1533\PR0231158\COMPLIANCE INFO 2010-2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1110-15 Psi <br /> Piping Run 41 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3' <br /> Length of Piping Run: Approx. 10' Approx.55' Approx. 10' Approx.55' <br /> Product Stored: Diesel Siphon Diesel Master Diesel Siphon Diesel Master <br /> Method and location of <br /> i in -run isolation: Test boot at STP#2 Test boot at STP#2 Test boot at STP#4 Test boot at STP#4 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:45 10:50 10:55 11:10 <br /> Initial Reading(R,): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time: 11:45 11:50 11:55 12:10 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour I Hour 1 Hour <br /> Change in Reading(RF-RO: 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail X Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-up forfalled tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.