My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2300 - Underground Storage Tank Program
>
PR0231158
>
COMPLIANCE INFO 2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 11:57:53 AM
Creation date
11/5/2018 5:15:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2013
RECORD_ID
PR0231158
PE
2361
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDSAY\1533\PR0231158\COMPLIANCE INFO 2010-2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer D Industry Standard X Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: 0 Pressure D Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used:Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#I Sump#2 Sump#3 Sump#4 <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 40" 40" 40" 41" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 21" 25" 22" 24„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 12" 12" 12" 15" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested' Water Line 23" Water Line 27' Water Line 24" Water Line 26" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both No No No No <br /> product and water)? <br /> ater <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe No No No No <br /> shutdown? <br /> Was fail-safe verified to be N/A N/A N/A N/A <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 11:50 11:55 11:00 11:05 <br /> Initial Reading(RO: .001 .001 .001 .001 <br /> Test End Time: 12:20 12:25 11:30 11:35 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-RO: 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail <br /> Was sensor removed for testing? X Yes D No DNA X Yes ONO DNA X Yes D No 0 NA X Yes 0 No [INA <br /> Was sensor properly replaced and X Yes 0 No 0 NA X Yes D No D NA X Yes D No DNA X Yes []No DNA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior io testing, and recommended follow-up for failed tests) <br /> Site not equipped with Turbin Shut Down. Line Testing Required Annually! <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to aU of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.