My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7500
>
2300 - Underground Storage Tank Program
>
PR0231644
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 1:08:00 PM
Creation date
11/5/2018 5:20:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231644
PE
2381
FACILITY_ID
FA0003207
FACILITY_NAME
JEFFERSON ESD-JEFFERSON SCHOOL
STREET_NUMBER
7500
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25332018
CURRENT_STATUS
02
SITE_LOCATION
7500 LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINNE\7500\PR0231644\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DTFSAN JOA UI COUNTY <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />w �;1810 E IWFLTON AVE. S7OCKTOR rA 95205 <br />DEVELOPMENT SERNCES PHONE 12091 468-3120 <br />PLANWIG PHONE 12091 468-3120 <br />BUILDING PHONE 12091 4683123 <br />NEIGHBORHOOD PRESEI1vAnON PHONE 12091 4683021 <br />HACRFILL EXCAVATION CERTIFICATE <br />Project Location 7500 W Linne Road Tracy CA 95376 <br />Owner Jefferson School District Phone NO. (209)836-3388 <br />Contractor Jim Thorpe Oil, Inc. Phone No. (209)368-6175 License No. 495699 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. <br />Submission of Soil Engineer's Compaction Report <br />within 30 days of project <br />_ <br />completion, or <br />7. <br />Submission of verification, e.g. load ticket, <br />within 30 days of project <br />-- <br />completion that one of the following materials was <br />placed in the excavation In <br />12" lifts: <br />X A. Pea gravel - smooth, rounded material <br />not more than one-half (1/2,) <br />Inch in diameter. <br />B. Crushed rock - self -compacting material <br />not more than three-quarters <br />_ <br />(3/4) inch in cross sectional measurement. (Use of crushed rock <br />will not be permitted for backfill if <br />contact will be made between <br />the backfill material and tanks/pipes <br />made of poly resin glass or <br />similar materials.) <br />DECLARATION <br />I hereby <br />certify that a Soil Engineer's Compaction Report will <br />be submitted within 30 days <br />of project completion, or submission of verification that the select <br />material described above <br />will be <br />placed at a minimum of five (5) cubic yards per 1000 <br />gallon tank displacement and <br />that the <br />entire excavation will be backfllled and compacted to insure compliance with the <br />Uniform <br />Building Code Appendix chapter 70. <br />* Richard Thorpe/ Contractor <br />Name (Print) <br />President/ Jim Thorpe Oil Inc. _ <br />Tit (Print <br />lgnature <br />* Shall be the responsible managing employee on the license or authorized <br />agent. <br />6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.