Laserfiche WebLink
C� <br />D. Results of Testing/Servicing <br />Soffware Version Installed: 331.00 <br />Complete the fallowing checklist: <br />C] <br />® Yes <br />❑ No* <br />Is the audible alarm operational? <br />Z Yes <br />❑ No* <br />Is the visual alarm operational? <br />® Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />roper operation? <br />❑ Yes <br />No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />Z NIA <br />YesLj <br />Ne* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br />❑ N/A <br />detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) <br />® Sump/Trench Sensors, ❑ Dispenser Containment Sensors. Did you confirm positive shut -down due to leaks and sensor <br />Failure/disconnection? N Yes; ❑ No. <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br />Z N/A <br />valve is installed), isthe overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent <br />Flappers <br />of tank capacity does the alarm trigger? 30% <br />Yes' <br />❑ No <br />Was any monitoring equipment replaced? if yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes' <br />No <br />Was Liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ Product; ❑ Water. <br />If yes, describe causes in Section E, below. <br />9� Yes <br />❑ No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />Yes <br />❑ No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />Cold started Veeder Root due to defective battery and completed partial monitor certification. <br />Tested positive shut down on all 4 STP sumps. All Tests OK Tested both annual sensors for audible and visual alarm. <br />Tested sensor out and fail safe. All Tests OK <br />Monitoring System Certification Page 2 of 4 12107 <br />2/21/07 <br />