Laserfiche WebLink
0 0 e c I ev/0 <br />Page 3 of 8 [C4.CIIE..COVC-E <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer industry Standard U Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br />Piping Run # 87 Piping Run # 89 Piping Run # 91 Piping Run # Diesel <br />Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br />Piping Manufacturer: AO Smith AO Smith AO Smith AO Smith <br />Piping Diameter: <br />3 in <br />3 in <br />3 in 3 in <br />Length of Piping Run: <br />156 feet <br />156 feet <br />156 feet 156 feet <br />Product Stored: <br />Gasoline <br />Gasoline <br />Gasoline Gasoline <br />Method and location of <br />87 Sump - <br />89 Sump - <br />91 Sump - Diesel Sump - <br />piping -run isolation: <br />Dispensers <br />Dispensers <br />Dispensers Dispensers <br />Wait time between applying <br />pressurelvacuum/water and <br />5 min <br />5 min <br />5 min 5 min <br />starting test: <br />Test Start Time: <br />2:45 PM <br />2:45 PM <br />2:45 PM 2:45 PM <br />Initial Reading (R,): <br />5 psi <br />5 psi <br />5 psi 5 psi <br />Test End Time: <br />3:45 PM <br />3:45 PM <br />3:45 PM 3:45 PM <br />Final Reading (Rr): <br />5 psi <br />5 psi <br />5 psi 5 psi <br />Test Duration: <br />60 min <br />60 min <br />60 min <br />in Reading (RF -R,): <br />0 <br />0 <br />0Pass/Fail <br />JF <br />Threshold or <br />5 psi <br />5 psi <br />E60minChange <br />5 psi <br />Criteria:Test <br />Result• <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Pass ❑ Fail ❑ <br />Comments — (include information on repairs made prier to testing and recommended follow-up for failed tests) <br />