Laserfiche WebLink
0 0 e c , o' <br />Page 4 of 8 ,ZoCq, <br />6. PIPING SUMP TESTING <br />Test Method Developed Bv: ❑ Sump Manufacturer E Industry Standard ❑ Professional Engineer <br />. _ <br />❑Other (Spec) <br />Test ethod Used: <br />M <br />❑ Pressure <br />EI Vacuum <br />®Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Level Change Indicator <br />Equipment Resolution: 0.0025 <br />Sump # 87 <br />Sump # 89 <br />Sump # 91 <br />Sump # Diesel <br />Sump Diameter: <br />42 in <br />42 in <br />42 in <br />42 in <br />Sump Depth: <br />41 in <br />40 in <br />41 in <br />41 in <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />22 in <br />22 in <br />22 in <br />20 in <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />17 in <br />17 in <br />17 in <br />17 in <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Dry <br />Dry <br />ump Tested' <br />2" above prod. piping <br />2" above prod. piping <br />2" above prod. piping <br />2° above prod. piping <br />e shut down when <br />r detects liquid (both <br />r <br />❑Yes ❑No UNA <br />❑Yes ❑No ®NA <br />❑Yes ❑No MNA <br />[]Yes ❑No UNA <br />product water)?* <br />tdown response time <br />See comments <br />* See comments <br />" See comments <br />" See comments <br />rogrammed for fail-safe <br />'❑Yes ❑No UNA <br />❑Yes ❑No ®NA <br />❑Yes ❑No UNA <br />shutdown?* <br />Was fail-safe verified to be <br />❑Yes [:]No ®NA <br />❑Yes [—]No ®NA <br />[—]Yes [-]No ®NA <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and starting5 <br />MOP <br />min <br />5 min <br />5 min <br />test: <br />Test Start Time: <br />3:20 PM <br />4:00 PM <br />3:45 PM <br />Initial Reading (Rj): <br />0 <br />0 <br />0 <br />Test End Time: <br />3:50 PM <br />4:30 PM <br />4:15 PM <br />Final Reading (RF): <br />0 <br />0 <br />0 <br />0 <br />Test Duration: <br />30 min <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF -R,): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0.0025 <br />0.0025 <br />0.0025 <br />0.0025 <br />Test Result: _ <br />Pass ❑Fail <br />® Pass L1Fail <br />Z Pass ❑ Fail <br />®;Pass ElFail <br />Was sensor removed for testing? <br />ZYes ❑No []NA <br />ZYes ❑No ❑NA <br />MYes ❑No ❑NA <br />®Yes ❑No ❑NA <br />Was sensor properly replaced and <br />®yes ❑No DNA <br />ZYes [:]No [:INA <br />®Yes ❑No [INA <br />NYes ❑No ❑NA <br />verified functional after testing? <br />Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />" Sump(s) sensor(s) were tested separately as part of the annual monitor certification test. <br />if the entire depth of the sump is not tested, specify how much was tested. if the answer to anv of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />