My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011- 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2011- 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 7:08:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011- 2015
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2011- 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2011- 2015
QuestysRecordDate
5/17/2017 4:55:05 PM
QuestysRecordID
3383937
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />EAG &/ <br />Page 5 of 8 cc. L� C°.P .Ancr <br />7, UNDER-DISPENSER CONTAINMENT UDC TESTING <br />Test Method Developed By: ❑ UDC Manufacturer Industry Standard ❑ Professional Engineer <br />[] Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum Hydrostatic <br />[I Other (Spec) <br />Test Equipment Used: Tape Measure Equipment Resolution: 1116 in <br />UDC # 1-2 UDC # 3- UDC # 5-6 UDC # 7-8 <br />UDC Manufacturer: Bravo Bravo Bravo Bravo <br />UDC Material: Steel Steel Steel Steel <br />UDC De the 8 in 8 in 8 in 8 in <br />Height from UDC Bottom to Top 0 in 0 in 0 in 0 in <br />of Hi hest Pi ing Penetration: <br />Height from UDC Bottom to 0 in 0 in 0 in 0 in <br />Lowest Electrical Penetration: <br />Condition of UDC prior to Dry Dry Dry Dry <br />testin : <br />Portion of UDC Tested` 7" 7" 7„ 7.. <br />Does turbine shut down when <br />UDC sensor detects liquid (both Eyes ❑No ENA [-]Yes ❑No ®NA ❑Yes ❑No ZNA Eyes ❑No MNA <br />roduct and water)?* <br />Turbine shutdown response time ` See comments " See comments " See comments " See comments <br />Is system programmed for fail- Dyes [-]No ®NA Eyes ❑No ENA Eyes ❑No ZNA Dyes ❑No NNA <br />safe shutdown?* <br />Was fail-safeverified to be [:]Yes ❑No ®NA Eyes ❑No ®NA ❑Yes ❑No ®NA ❑Yes -]No HNA <br />o erational?" <br />Wait time between applying 5 min 5 min 5 min 5 min <br />pressure/vacuum/water and <br />startin test <br />Test Start Time: 2:00 PM 2:00 PM M60min <br />M60min <br />Initial Reading (R[): 7 7 <br />Test End Time: 3:00 PM 3:00 PM <br />Final Reading (RF): 7 7 <br />Test Duration: 60 min 60 minChange in Reading (RF-R,): 0 0 <br />Pass/Fail Threshold or Criteria: 1/16 in 1/16 in 1/16 in 1/16 in <br />Test Result- ® Pass Ll Fail Z Pass ❑ Fail Pass ❑Fail Pass [] Fail <br />Was sensor removed for testing? ❑Yes ❑No NNA ❑Yes ❑No ®NA ❑Yes [-]No ®NA ❑Yes ❑No ENA <br />Was sensor properly replaced and <br />verified <br />[7]No ZNA Eyes ❑No ENA Eyes ❑No ®NA Eyes ❑No ENA <br />verified functional after testin 7? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for ailed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is `TIO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.