My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011- 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2011- 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 7:08:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011- 2015
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2011- 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2011- 2015
QuestysRecordDate
5/17/2017 4:55:05 PM
QuestysRecordID
3383937
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />• <br />Page of <br />Test Method Developed By: Piping Manufacturer Industry Standard X Professional Engineer <br />Other (Specify) <br />Test Method Used: X Pressure Vacuum Hydrostatic <br />Other (Specify) <br />6Test Equipment Used: NITROGEN <br />Piping Run # 1 Piping Run # 2 <br />Equipment Resolution: <br />Piping Run # 3 Piping Run # 4 <br />Piping Material: <br />FRP <br />FRP <br />FRP <br />FRP <br />Piping Manufacturer: <br />AMARON <br />AMARON <br />AMARON <br />AMARON <br />Piping Diameter: <br />3" OVER 2" <br />3" OVER 2" <br />3" OVER 2" <br />3" OVER 2" <br />Length of Piping Run: <br />160' <br />170' <br />180' <br />170' <br />Product Stored: <br />PREMIUM <br />PREMIUM <br />UNLEADED <br />DIESEL <br />Method and location of <br />piping -run isolation: <br />SUMP'S <br />SUMP'S <br />SUMP'S <br />SUMP'S <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 min <br />30 min <br />30 min <br />30min <br />"Test Start Time: <br />9:45 AM <br />9:45 AM <br />9:45 AM <br />9:45 AM <br />Initial Reading (Rj): <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />10:4 AM <br />10:45 AM <br />10:45 AM <br />10:45 AM <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading (RF -R`): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />5 Psi <br />5 psi <br />5 psi <br />5 psi <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />MAY 19 ZU15 <br />■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.