Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: Sump Manufacturer <br />Other (Spec) <br />Test Method Used: Pressure <br />Other (Specify) <br />Test Equipment Used: INCON TS -STS <br />Sump Diameter. <br />Sump Depth:. <br />Sump Material: <br />FRPHeight from Tank Top to Top <br />of Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?` <br />Was fail-safe verified to be <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />WT <br />Sump # 1 91 Tl <br />4277 <br />3877 <br />FRP <br />187' <br />1011 <br />CLEAN/DRY <br />227' <br />Page of <br />Industry Standard X Professional Engineer <br />Vacuum X Hydrostatic <br />Sump # 2 91 T2 <br />42" <br />3,6" <br />FRP <br />12" <br />91} <br />CLEAN/DRV <br />16f1 <br />Equipment Resolution: <br />Sump # 3 87 <br />4211 <br />3671 <br />FRP <br />17" <br />13" <br />CLEANIDRY <br />2017 <br />Sump # 4 DIESEL <br />42" <br />336" <br />FRF <br />1731 <br />971 <br />CLEAN/DRY <br />20" <br />X Yes ❑ No ❑ NA I X Yes ❑ No LINA I X Yes []No ❑ NA I X Yes ❑ No ❑ NA <br />15 see 1 15 see <br />X Yes ❑ No ❑ NA X Yes ❑ No ❑ NA <br />XYes []No DNA <br />30 min <br />10:38 AM <br />5.8045 <br />10:53 AM <br />5.8036 <br />15 min <br />.0009 <br />.002 <br />X Pass ❑ Fail <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />30 min <br />10:58 AM <br />5.2461 <br />11:13 AM <br />5.2468 <br />15 min <br />.0007 <br />.002 <br />X Pass ❑ Fail <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />15 see <br />X Yes ❑ No ❑ NA <br />XYes 11 No 11 NA <br />30 min <br />10:38 AM <br />4.4043 <br />10:53 AM <br />4.4031 <br />15 min <br />.0012 <br />.002 <br />X Pass ❑ Fail <br />XYes El No 11 NA <br />X Yes ❑ No ❑ NA <br />15 see <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />30 min <br />10:38 AM <br />5.7318 <br />10:53 AM <br />5.7307 <br />15 min <br />.0011 <br />,002 <br />X Pass ❑ Fail <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No [INA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />MAY 19 7015 <br />ENVIRON <br />WcAvrk,r'l eF� <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NAi1, the entire sump must be tested. (See SWRCB LG -160) <br />