My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011- 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2011- 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 7:08:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011- 2015
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2011- 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2011- 2015
QuestysRecordDate
5/17/2017 4:55:05 PM
QuestysRecordID
3383937
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />0 0 <br />Page of <br />1. U111flr,lc-L13rZA3r.1C 1_Uir 1AIINMEN I UUC 'l'L+'S'1'1NG <br />Test Method Developed By: UDC Manufacturer Industry Standard X Professional Engineer <br />Other ("Spec) <br />Test Method Used: Pressure Vacuum X Hydrostatic <br />Other (Spec) <br />Test Equipment Used: 1NCON TS -STS <br />UDC # 112 UDC # 3/4 <br />UDC Manufacturer: <br />BROVO <br />BROVO <br />UDC Material: <br />STEEL <br />STEEL <br />UDC Depth: <br />91+ <br />991 <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />BOTTOM <br />BOTTOM <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />BOTTOM <br />BOTTOM <br />Condition of UDC prior to <br />testing: <br />DRY <br />DRY <br />Portion of UDC Tested <br />671 <br />6" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?" <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No XNA <br />Turbine shutdown response time <br />15 sec <br />15 sec <br />Is system programmed for fail- <br />safe shutdown?' <br />❑ Yes ❑ Na X NA <br />❑ Yes ❑ No XNA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No XNA <br />❑Yes ❑ No XNA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />30 min <br />30 min <br />Test Start Time: <br />11:30 AM <br />11:30 AM <br />Initial Reading (R,): <br />1.3754 <br />1.8894 <br />Test End Time: <br />11:45 AM <br />11:45 AM <br />Final Reading (RF). <br />1.3751 <br />1.88% <br />Test Duration: <br />15 min <br />15 min <br />Change in Reading (RF -R,): <br />.0003 <br />.0002 <br />Pass/Fail Threshold or Criteria: <br />.002 <br />.002 <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Was sensor removed for testing? <br />❑ Yes []No XNA <br />❑ Yes ❑ No XNA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No X NA <br />Equipment Resolution: <br />UDC # 4/5 <br />BROVO <br />STEEL <br />9" <br />BOTTOM <br />BOTTOM <br />DRY <br />6'91 <br />❑ Yes ❑ No X NA <br />15 sec <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No XNA <br />30 min <br />11:30 AM <br />1.4931 <br />11:45 AM <br />1.4827 <br />15 min <br />.0004 <br />.002 <br />X Pass ❑ Fail <br />11 Yes ❑ No X NA <br />❑Yes 11 No XNA <br />UDC #516 <br />BROVO <br />STEEL <br />979 <br />BOTTOM <br />BOTTOM <br />DRY <br />691 <br />❑Yes 0 N XNA <br />15 sec <br />❑Yes 0 N XNA <br />❑ Yes ❑ No XNA <br />30 min <br />10:58 AM <br />5.4445 <br />11:13 AM <br />5.4443 <br />15 min <br />.0002 <br />.002 <br />X Pass ❑ Fail <br />❑Yes 11 No XNA <br />❑ Yes ❑ No X NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />M,Ay I_g ?6i5 <br />W� <br />i If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an. <br />asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.