Laserfiche WebLink
SWRCB, January 2002 <br />0 0 <br />Page of <br />1. U111flr,lc-L13rZA3r.1C 1_Uir 1AIINMEN I UUC 'l'L+'S'1'1NG <br />Test Method Developed By: UDC Manufacturer Industry Standard X Professional Engineer <br />Other ("Spec) <br />Test Method Used: Pressure Vacuum X Hydrostatic <br />Other (Spec) <br />Test Equipment Used: 1NCON TS -STS <br />UDC # 112 UDC # 3/4 <br />UDC Manufacturer: <br />BROVO <br />BROVO <br />UDC Material: <br />STEEL <br />STEEL <br />UDC Depth: <br />91+ <br />991 <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />BOTTOM <br />BOTTOM <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />BOTTOM <br />BOTTOM <br />Condition of UDC prior to <br />testing: <br />DRY <br />DRY <br />Portion of UDC Tested <br />671 <br />6" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?" <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No XNA <br />Turbine shutdown response time <br />15 sec <br />15 sec <br />Is system programmed for fail- <br />safe shutdown?' <br />❑ Yes ❑ Na X NA <br />❑ Yes ❑ No XNA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No XNA <br />❑Yes ❑ No XNA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />30 min <br />30 min <br />Test Start Time: <br />11:30 AM <br />11:30 AM <br />Initial Reading (R,): <br />1.3754 <br />1.8894 <br />Test End Time: <br />11:45 AM <br />11:45 AM <br />Final Reading (RF). <br />1.3751 <br />1.88% <br />Test Duration: <br />15 min <br />15 min <br />Change in Reading (RF -R,): <br />.0003 <br />.0002 <br />Pass/Fail Threshold or Criteria: <br />.002 <br />.002 <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Was sensor removed for testing? <br />❑ Yes []No XNA <br />❑ Yes ❑ No XNA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No X NA <br />Equipment Resolution: <br />UDC # 4/5 <br />BROVO <br />STEEL <br />9" <br />BOTTOM <br />BOTTOM <br />DRY <br />6'91 <br />❑ Yes ❑ No X NA <br />15 sec <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No XNA <br />30 min <br />11:30 AM <br />1.4931 <br />11:45 AM <br />1.4827 <br />15 min <br />.0004 <br />.002 <br />X Pass ❑ Fail <br />11 Yes ❑ No X NA <br />❑Yes 11 No XNA <br />UDC #516 <br />BROVO <br />STEEL <br />979 <br />BOTTOM <br />BOTTOM <br />DRY <br />691 <br />❑Yes 0 N XNA <br />15 sec <br />❑Yes 0 N XNA <br />❑ Yes ❑ No XNA <br />30 min <br />10:58 AM <br />5.4445 <br />11:13 AM <br />5.4443 <br />15 min <br />.0002 <br />.002 <br />X Pass ❑ Fail <br />❑Yes 11 No XNA <br />❑ Yes ❑ No X NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />M,Ay I_g ?6i5 <br />W� <br />i If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an. <br />asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />