Laserfiche WebLink
1 2 3 4 1 5 1 6 1 7 8 9 10 1 11 12 1 13 1 14 1 15 1 16 1 17 1 18 <br /> i <br /> 36" MULTIPORT MANHOLE WITH <br /> CONTAINMENT SUMP LIQUID TIGHT FILL BOX 36" MULTI PORT MANHOLE WITH 36" MANHOLE <br /> • VAPOR RECOVERY ADAPTOR LIQUID TIGHT FILL BOX INSTALL OBSERVATION PORT <br /> 36" MULTIPORT SUMP SHIELD AND CAP SUMP SHIELD OVER SUMP PROBE <br /> TION PORT IN <br /> MANHOLE MANHOLALIGN E THAT OF THE M <br /> 4" NIPPLE CONTAINMENT SUMP COVER. <br /> 27 FUEL TANK COLOR CODED PRODUCT COLLAR — CEI TLM PROBE MOUNTING FITTING 3/4" EXPLOSION <br /> MANWAY API COLORED REFLECTOR PROOF 45' ELBOW <br /> 4" TOP SEAL ADAPTOR AND CAP 4" CAP ON RISER COMPRESSIBLE STYROFOAM SEAL OFF <br /> Y FRP VENT LINE PEA GRAVEL JUNCTION BOX (IF LESS THAN 2" FROM <br /> 4" NIPPLE SLOB) PIPE CAP WITH HOLE <br /> PIPE CAP WITH HOLE FOR CONTAINMENT SUMP FOR CONTROL WIRES <br /> SUMP PENETRATION CONTROL WIRES <br /> 8007 <br /> 2" MIN. 2" MIN. .� � REDUCER <br /> Y BELLxMALE FRP 4" MAX, 4" MAX. COMPRESSIBLE STYROFOAM (IF LESS - <br /> THREADED ADAPTOR ' � .: � r �; • ° .0 THAN 2" FROM SLAB) 1 40 <br /> 2"x18" FLEX CONNECTOR �,.' <br /> MALE SWNEL/FEMALE 1 •• " • " •,• « r �• <br /> E^ PEA GRAVEL 1 <br /> COMPRESSIBLE STYROFOAM CONTAINMENT SUMP --- - - JUNCTION BOX (EXPLOSION PROOF) PEA GRAVEL <br /> (IF LESS THAN Y FROM SLAB) REDUCER SEAL OFF <br /> 4"-300N COUPLING 4"-300# COUPLING 3/4" CONDUIT FOR ELECTRONIC TANK <br /> i GAUGE WITH SEAL OFF - REFER TO TURBINE PUMP JUNCTION BOX <br /> 4' SCH. 40 RISER ELECTRICAL SHEETS (EXPLOSION PROOF) <br /> CONTAINMENT SUMP PRIMED AND WRAPPED 2" NIPPLE I SEAL OFF <br /> REDUCER 3/4" CONDUIT REMOTE PUMP J-BOX <br /> 3/4" CONDUIT FROM I (F BALL VALVE SUMP PENETRATION <br /> CONTAINMENT SUMP ANNULAR SPACE MONITOR I SUMP PENETRATION BOOT (FULL PORT) � BOOT (FOR CONDUIT) <br /> JUNCTION BOX (FOR CONDUIT) 2" CLOSE NIPPLE i i" CONDUIT TO <br /> K <br /> �TL 4" ALUMINUM FILL TUBE I CEI CONTROL PANEL K <br /> 2' BELLxMALE F.R,P, I 4" SCH. 40 RISER,PRIMED & WRAPPED Y TEE I <br /> THREADED ADAPTOR - 1 3/4" CONDUIT TO <br /> 4 3/4" CONDUIT FROM <br /> " SCH. 40 RISER I ELEC. PANEL <br /> 2'x1B" FLEX CONNECTOR SEE NOTE FILL SUMP J-BOX <br /> \ PRIMED AND WRAPPED SUMP PENETRATION BOOT I MALE SWIVEL/FEMALE (PUMP POWER) <br /> 3 SUMP PENETRATION BOOT <br /> 3' IO Z REDUCER BOOT W/TEST F-2 (FOR CONDUIT) <br /> 2" F.R.P. VENT LINE I PORT (4"TOS AT REG. TAW) I LINE PRESSURE <br /> TANK FITTING SLOPE 1/4" PER FT. TRANSDUCER <br /> MINIMUM DOWN TO TANK I Y F,R.P. PHASE II VAPOR RETURN 2" CLOSE NIPPLE <br /> IN 3" FRP SECONDARY CONT. Y BALL VALVE <br /> V VA FIBERGLASS CONTAINMENT SUMP PIPE l3" IN 4" AT REG. TANK) 3 (FULL PORT) <br /> TO TANK COLLAR TO INSURE <br /> WATER TIGHTNESS I SEE NOTE F-2 <br /> FEMAL MALE SWIVEL x <br /> SEAL AT PLATE CONNECTION 2° % 78' FLEXIBLE FEMALE FLEXIBLE CONNECTOR I SUMP PENETRATION <br /> CONNECTOR SUMP PENETRATION BOOT I BOOT FOR PIPE <br /> ,J 2Y TANK MANWAY NOTE: DO NOT EXCEED ( ) J <br /> MALE SWNEL/FEMALE ca Y 45' F.R.P. SEE NOTE MANUFACTURERS SPECIFIED 7' FRP PRODUCT <br /> PIPE IN 5" FRP <br /> 2" 90' S EEL EXTRACTOR FITTING I F-2 BEND RADIUS. SECONDARY CONT. <br /> ELBOW 'a 2" BELLxMALE PR.P. <br /> SEE NOTE BELOW 2Y TANK. MANWAY f w THREADED ADAPTOR a PIPE <br /> a SEE NOTE 4" RISER PIPE Lj <br /> 7x16" FLEX CONNECTOR - 4" SCH. 40 NIPPLE AND 4° COUPLING F-2 PRIMED AND WRAPPED <br /> MALE <br /> NOTEEBELOWALE TO REQUIREDTFLOAT LENGTH EXTENSION TO I' PVC BOTTOM.PIPE <br /> ATTACOPEN <br /> H TO AT <br /> SUMP <br /> BELLxMALE F.R.P. <br /> AS NEEDED FOR SUPPORT. 4" N.P.T. I" PVC PIPE OPEN AT <br /> THREADED ADAPTOR 3" 95% FLOAT VENT/VAPOR- - BOTTOM. ATTACH SUMP <br /> SEE NOTE BELOWtt _ VALVE API/RONAN LS-3 PROBE 4° N.P.T. AS NEEDED FOR SU SUPPORT. <br /> Y FRP-05 ELBOW - PLUGGED API/RONAN <br /> SEE NOTE BELOWH SBUOMOP PENETRAT ON NOTES: ` NOTES: ' i, WATE <br /> R F70A 67AT - NOTES: LS-3 PROBE L.I <br /> 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT _ - 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT 3"x2" REDUCER WITH <br /> Y FRP PHASE II - - OPEN NPT PORT FOR <br /> VAPOR RETURN IH 3"SEO,U'N 1: SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE <br /> NOTE: SEE NOTE BELOW PENETRATION ANGLE. PENETRATION ANGLE. BOTTOM LOCKING NUT PENETRATION ANGLE. SECONDARY CONT, <br /> DRAINAGE <br /> I. VAPOR RETURN LINE TO THE FALL-OUTTANK -ti pe 2. USE SUMP PENETRATION BOOTS AT ALL 2. USE SUMP PENETRATION BOOTS AT ALL STEEL PLATE AT TANK BOTTOM 2. USE SUMP PENETRATION BOOTS AT ALL <br /> gFR.P. M4 SBC, C0I4T,WITH A 3"x18" ' PENETRATIONS OF SUMP. PENETRATIONS OF SUMP. PENETRATIONS OF SUMP. Y SCH. 40 FRP BELL <br /> LE/FEMI FLEX CONNECTOR. 3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN x MALE THREADED <br /> REFER TO SHEET F-1 AND THE PIPING V-0" OF THE TOP OF SUMP. V-O" OF THE TOP OF SUMP, I'-O" OF THE TOP OF SUMP ADAPTOR <br /> PLAN SPECIFIC TO THE SITE. <br /> �-L T7 AA VENT ANS VAPOR PLAN 3A FII I nFTAIL 3B TLM PROBE, VENT AND VAPOR DETAIL 2 REMOTE PUMP DETAIL <br /> Q SCALE: i"=1'-0" SCALE: i"=1'-O" - SCALE: 1"=1 -0" SCALE: 1"=1'-0" Gi <br /> O <br /> 3 - PEA GRAWEL <br /> INSTALLATION INSTRUCTIONS: BACKFILL FOR DETAIL OF TANK SLAB <br /> 1. INSERT FISH TAPE THROUGH ANNULAR SPACE, <br /> 2. ATTACH PULL-STRING TO SENSOR. i zxJQ a SHEET F-3 <br /> 3. TAG SIGNAL CABLE AND PULL-STRING EACH " - za w� <br /> 18 FEET FROM SENSOR. (TYPICAL FOR <br /> B FOOT DIAMETER TANK.) - -- - - - - - - - - -'- "- _ - - - - - T T r4. <br /> MP GENERAL NOTES: <br /> J BE F <br /> 4, ATTACH FISH TAPE TO PULL-STRING. i x m--_ �fTI- 1. ALL GASOLINE TANK RISERS AND FITTINGS TO BE SCHEDULE 40 BLACK IRON PIPING. <br /> F 5. PULL SENSOR THROUGH ANNULUS. JUNCTION BOX 'L� <br /> 6, MATCH TAG MARK ON SIGNAL GABLE SET TANK DEPTH A ALLOW E m -]T <br /> AND PULL-STRING. PRODUCT, VAPOR AND VENT r 2. PRODUCT, VENT AND VAPOR LINE SIZE TO BE AS NOTED ON SHEET F-1 ,AND PIPING PLAN. <br /> 7, SENSOR IS NOW POSITIONED AT I6" MANHOLE W/ LINES TO SLOPE 1/4" PER o 0 <br /> BOTTOM CENTERLINE OF TANK. SECURED LID FOOT MIN. DOWN TO TANK. <br /> 8. PULL-STRING IS TO REMAIN STEEL PLATE 3, ALL STEEL PIPE TO BE PRIMED AND WRAPPED. <br /> IN PLACE AND FUTURE . WATER TIGHT SEAL _ _ _ _ _ _ _ 4. SEE SITE PLAN FOR EXACT LOCATION OF PRODUCT TANKS, <br /> ACCESSIBLE. - - - - - - - - - - - - <br /> g ANNULAR SPACE <br /> } RISER CAP ti / � � I � �" ® 5. SEE SITE PLAN FOR VENT RISER LOCATION. <br /> MONITOR TAG & d x / 1/ 4' ALUMINUM FILL TUBE 6. J-BOX SHALL HAVE 2" MINIMUM CLEARANCE FROM SUMP WALL. <br /> HOLDER T <br /> o a � I 17. CONTACT CHEVRON ENGINEER REGARDING 15 GALLON SPILL BUCKET REQUIREMENTS. <br /> MONITOR PROBE TO LOW I CONTRACTOR SHALL VERIFY THAT THE <br /> E - 3 I END OF TANK. I E <br /> I* MAXIMUM 0 / TURBINE HEAD WILL BE BETWEEN 4" TO 6' <br /> 4" SCH. 40 NIPPLE W SLOPE TANK i" IN 10' / IqI / ABOVETHE TANK BOTTOM. DO NOT <br /> Of DOWN TOWARDS FILL END <br /> 4"-300N COUPLING �' U /� INSTALL TURBINE PUMP ASSEMBLY IF <br /> - - - - - - - - - - - Li - - - — ' El <br /> - IT IS LESS THAN 4' FROM BOTTOM <br /> of _fl- I OF TANK. <br /> 3/4" 0 CONDUIT -- 1�n1 <br /> TO FILL SUMP J-BOX .., �= STEEL PLATES UNDER EACH OPENING 'elov, <br /> �IiI P <br /> BY TANK MANUFACTURER REMOVE SHIPPING PADS FROM <br /> TANK PRIOR TO INSTALLATION <br /> w O <br /> 4" SCH. 40 PIPE RISER -- <br /> N PRIMED & WRAPPED FILL TUBE 2'-0 - 37 1/2" 2 0 <br /> ,x MIN. VERIFY W/0 TANNK MFG. MIN. - <br /> SEAL ENTRY BOOT CONNECTION SERRATED MARK DATE I REVIE91 >m INETIAL <br /> 4" SCH, 40 PIPE RISER6^ 45' ;., TO CONTAINMENT SUMP FLANGED NUT <br /> PRIMED & WRAPPED MAX. '^ O FIBERGLASS TANK AND EXCAVATION SECTION (TYR.) TANK, SECTION AND DETAILS <br /> FLEXIBLE ENTRY BOOT <br /> d STA'"` <br /> SCALE: 1/4"=1'-0" ESS STEEL <br /> C12K GAL 8'+ "XERXES" DBL WALL <br /> TANK � U+MP <br /> FITTING STEEL PLATE 0 0 d <br /> a c 9-2396 C <br /> N o a O 25 Y 99 NO., <br /> D ACAM OCA <br /> n SIDE VIEW ;T TANK BOTTOM <br /> _ _ D D M Chevron <br /> + ' <br /> wo <br /> M PIPE OR <br /> ' CONDUIT COMPRESSION RING <br /> -INTERIOR OF SUMP <br /> WRE `- INSTALLATION CABLE WALL <br /> SENSOR , 1. USING COMPRESSION RING AS A GUIDE, DRILL PIPE/CONDUIT HOLE AND BOLT Northwest i'tI1WBSt l R RBgIOn B <br /> B _ -; HOLES THROUGH SUMP WALL PER TABLE BELOW. <br /> O ANNULAR SPACE MONITOR DETAIL / 2. ASSEMBLE PARS AS SHOWN ABOVE, UNIFORMLY TIGHTEN ALL BOLTS & ROBERT H. LEE & ASSOCIATES, INC. <br /> SCALE: 1"=Y-0" - 1 STAINLESS STEEL CLAMP TO 60-IN.LBS. TORQUE, ARCHrFECTVRE E1,14 NEERWo ENVIRCPAAENTAL SERVICES <br /> -- - FLEXIBLE PIPE/CONDUIT HOLE SAW BOLT HOLE 1137 NORTH McDOWELL BDULEVARD PETALUMA CA. 94954 (7D7) 765-1650 <br /> ENTRY BOOT NORMAL SIZE SIZE SIZE JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CML ENGINEER <br /> FEII 3/4"0 CONDUIT 3" 5/16"0 RHL REVIEW INMAL DATE DATE: <br /> w - FE83100 1"0 CONDUIT 3' 5/16"0 PRELIMINARY <br /> a FEB5200 270 FRP PIPE 4 1/2" 5/16"0 DR. BY: <br /> FEB6300 3"0 FRP PIPE 4 1/Y 5/16"0 PLANNING <br /> - STEEL BID <br /> ZNOTE: SUMP AND PENETRATIONS OF SUMP SHALL BE WATER TIGHT. BLDG PERMIT I APPR.: 'G A <br /> O PIPE/CONDUIT SUMP ENTRY DETAIL GENERAL BID <br /> A RHl <br /> PERM17 REVS <br /> Z SCALE: NONE CONSTRUCTIONSHEET $344.10 <br /> Z _ -- _ Do not use drawing <br /> § - for Construction r F-2 <br /> 6 <br /> unless initiated <br /> K <br /> 0 <br /> - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 <br />