Laserfiche WebLink
IL ' aRECtiVE <br /> JAN I <br /> 4. UNDER-DISPENSER CONTAINMENT UDC TES <br /> Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard �1'Fbt06 SdTP.6thlTeer <br /> ❑Other(Spec) <br /> Test Method Used: F1 Pressure [3 Vacuum <br /> ®Hydrostatic <br /> E]Other(Specify) <br /> Test Equipment Used: INCON TS-STS Equipment Resolution:0.0001 <br /> UDC#1/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: UNK UNK UNK UNK <br /> FG FG FG FG <br /> UDC Material: 35" 34„ 33.5" 35" <br /> UDC De the <br /> Height from UDC Bottom to Top 10„ 10++ 9'+ 10" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 10„ 11^ 9" I1" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to FAIR FAIR FAIR FAIR <br /> testing: 15„ 15" <br /> Portion of UDC Tested 15" 15" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> product and water)?* 10 SEC 10 SEC <br /> Turbine shutdown res rise time 10 SEC 10 SEC <br /> Is system programmed for fail- ®yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> safe shutdown? <br /> Was fail-safe verified to be ®yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN 15 MIN 15 MIN 15 MIN <br /> starting test <br /> Test Start Time: 11:18 11:18 11:18 12:40 <br /> Initial Reading(Ri): 3.2220 2.8556 3.4295 3.1398 <br /> Test End Time: 11:33 11:33 11:33 12:56 <br /> Final Reading(RF): 3.2219 2.8556 3.4295 3.1397 <br /> Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN <br /> Chane in Readin (Rr-Ri): 0.0001 0.0000 0.0000 0.0001 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> -Test Result: -0—pans--mFail Pass - Fail Pass Fail Pass Fail <br /> Was sensor removed for testin 7 Yes No LJ NA ®Yes E]No[:]NA ®Yes L]No❑NA ®Yes❑No❑NA <br /> W ns sensor properly replaced and ®�,�❑No❑NA ®Yes❑No[:]NA ®Yes❑No❑NA ®Yes❑No❑l <br /> verified functional after testin ? <br /> Comments (include information on repairs made prior to testing and recommended follow-up rorfailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> Secondary Containment Test Results 2 of 4 — <br />