My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
11/5/2018 8:14:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2012-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 5. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:INCON TS-STS Equipment Resolution:0.0001 <br /> UDC#9/10 UDC# 11/12 UDC# 13/14 UDC#15/16 <br /> UDC Manufacturer: UNK UNK UNK UNK <br /> UDC Material: FG FG FG FG <br /> UDC Depth: 34" 34" 351' 34" <br /> Height from UDC Bottom to Top 7„ 8" 9" 101, <br /> of Highest iping Penetration: <br /> Height from UDC Bottom to 91, q+, 9" 10" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to FAIR FAIR FAIR FAIR <br /> testing; <br /> Portion of UDC Tested] 15" 15" 15" 15" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both E Yes ElNo❑NA E Yes❑No El NA E Yes E]No❑NA E Yes[I No F1 NA <br /> product and water <br /> Turbine shutdown response time 10 SEC 10 SEC 10 SEC 10 SEC <br /> Is system programmed for fail- E Yes❑No❑NA E Yes❑No❑NA E Yes❑No❑NA ®Yes❑No❑NA <br /> safe shutdown? <br /> Was fail-safe verified to be E Yes❑No❑NA E Yes❑No❑NA E Yes❑No❑NA E Yes❑No❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN 15 MIN 15 MIN 15 MIN <br /> starting test <br /> Test Start Time: 12:40 12:40 1:48 1:48 <br /> Initial Reading(R,): 2.9754 4.1844 2.4265 1.4846 <br /> Test End Time: 12:56 12:56 2:03 2:03 <br /> Final Reading(Rr): 2.9750 4.1845 2.4265 1.4847 <br /> Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN <br /> Change in Reading(R,-R,): 0.0004 0.0001 0.0000 0.0001 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: ZPass 0 Fail Pass ❑ Fail Pass Fail Z Pass ❑Fail <br /> Was sensor removed for testin�. E Yes❑No❑NA Yes No❑NA E Yes No❑NA E Yes No❑NA <br /> Was sensor properly replaced and E Yes❑No❑NA E Yes❑No❑NA E Yes❑No❑NA E Yes❑No❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> RECEIVELU <br /> JAN 3 0 2015 <br /> ENVIRONMENTAL <br /> ,��6,ru ncv6CtTtlr_e IT <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(')is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> Secondary Containment Test Results 3 of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.