Laserfiche WebLink
SWRCB,January 2002 • • Page 2. <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑X Tank Manufacturer Industry Standard El Professional Engineer <br /> Other (Spec) <br /> Test Method Used: ❑% Pressure ❑ Vacuum ❑ Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run N 5 MID A Piping Run# Piping Run p Piping Run p <br /> Piping Material: f lex <br /> Piping Manufacturer: environ <br /> Piping Diameter: 2" <br /> Length of Piping Run: 2401 <br /> Product Stored: MIDGRADE <br /> Method and location of sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min <br /> starting test: <br /> Test Start Time: 17:31 <br /> Initial Reading(RI ): 5psi <br /> Test End Time: 18:31 <br /> Final Reading(RF ): 4.5psi <br /> Test Duration: 1hr <br /> Change in Reading(RF-I I ): .5ps i <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Test Result: ❑Passx❑ Fail ❑Pass ❑ Fail ❑Pass D Fail ❑Pass Fail <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />