Laserfiche WebLink
SWRCB,January 2002 • . Page 3. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑% Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used: ❑ Pressure Vacuum Hydrostatic <br /> 0 Other (Spec) <br /> Test Equipment Used: vp1t Equipment Resolution: +-.002 <br /> Sump# 6 PRE Sump# Sump# Sump# <br /> Sump Diameter: 48" <br /> Sump Depth: 59' <br /> Sump Material: fiberglass <br /> Height from Tank Top to Top of 21" <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 12" <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good <br /> Portion of Sump Tested: 1 23-- <br /> Does <br /> 3"Does turbine shut down when <br /> sump sensor detects liquid(both iflYes ONo❑N F]Yes F]No❑N Yes F]NoE]N []Yes F]No� <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 s ec <br /> Is system programmed for fail-safe ❑ � ❑ ❑ ❑ ❑ ^ ❑ ❑ <br /> shutdown?* Yes N N Yes N N Yes NOUN Yes No <br /> Was fail-safe verified to be [EYes oNo❑N Yes oNo�N Yes EjNo❑N Yes�No�N <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min <br /> test: <br /> Test Start Time: 17:30 <br /> Initial Reading(RI): 0 <br /> Test End Time: 18:00 <br /> Final Reading(RF): -.0004" <br /> Test Duration: 3 0min <br /> Change inReading(RF-RI ): -.0004" <br /> Pass/Fail Threshold or Criteria: +- .002u <br /> ,Test Result: E Pass ❑ Fail ElPass El Fail Pass El Fail El Pass 1-1 Fail <br /> Was sensor removed for testing? �Yes�No❑NA Yes No[:]NA Yes NoE]NA Yes❑No❑NV <br /> Was sensor properly replaced and ❑ ❑ ❑ ❑ o <br /> verified functional after testing? Ye N NA Ye N NA Ye N NA Yes N <br /> 11 1 <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />