Laserfiche WebLink
SWRCB,January 2002 Page 3. <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X❑ Tank Manufacturer Industry Standard Professional Engineer <br /> Other (Specify) <br /> Test Method Used: a Pressure Vacuum Hydrostatic <br /> Other (Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Ron# 6 PRE A Piping Run# 6 PRE R Piping Run# Piping Run# <br /> Piping Material: flexline flexline <br /> Piping Manufacturer: environ environ <br /> Piping Diameter: 2" 2" <br /> Length of Piping Run: 240' 240' <br /> Product Stored: PREMIUM PREMIUM <br /> Method and location of sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/waterand 5min 5min <br /> starting test: <br /> Test Start Time: 13:4 9 11:46 <br /> Initial Reading(RI ): 5psi 5psi <br /> Test End Time: 14 :4 9 12:46 <br /> Final Reading(RF ): 5psi 5psi <br /> Test Duration: lhr lhr <br /> Change in Reading(RF-RI ): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: Pass Fail 171 Pass E] Fail 0 Pass D Fail El Pass D Fail <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> plus secondary line a failed at boot in disp 7/6 <br />