Laserfiche WebLink
SWRCB,January 2002 ! 0 Page 4. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: F-1 Sump Manufacturer ❑ Industry Standard X❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used: F] Pressure ❑ Vacuum Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used: vp1t Equipment Resolution: +-002" <br /> Sump# 4 REG Snmp# 5 MID Sump# 6 PRE Sump ft 6 PRE <br /> Sump Diameter: 48" 48" 48" 48" <br /> Sump Depth: 59" 59" 59" 59" <br /> Sump Material: fiberglass fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 21" 21" 21" 21" <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 12" 12" 12" 12" <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good good good <br /> Portion of Sump Tested: t 23" 23" 23" 11" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both [T]Yes[�]NoE]N Yes DNo❑N Yes[�]No[�]N X❑Yes F]No❑AI <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5sec <br /> Is system programmed for fail-safe X❑ ❑ ❑ U^ ❑ ^ ❑ <br /> shutdown?* Yes N N X O yes NON X❑Yes NOUN X❑Yes No <br /> Was fail-safe verified to be ❑ � ❑ ❑ _]NA❑ ❑ � ❑ ❑ <br /> operational?* Yes N N X yes N X Yes N N X Yes No <br /> Wait time between applying <br /> pressure/vacuum/waterand starting 5min 5min 5min 5min <br /> test: <br /> Test Start Time: 11:50 10:36 10:28 10:45 <br /> Initial Reading(Rt): 0 0 0 0 <br /> Test End Time: 12:20 11:06 10:38 11:15 <br /> Final Reading(RF): +.0013" -.0019" -.0022" -.0005" <br /> Test Duration: 30min 30min 30min 30min <br /> Change inReading(RF-Rt ): +.0013" -.0019" -.0022" -.0005" <br /> Pass/Fail Threshold or Criteria: +-002" +-002" +-002" +-002" <br /> Test Result: El Pass E] Fail Pass [—] Fail F Pass Fail a Pass 0 Fail <br /> Was sensor removed for testing? x YesE:]NoE]NA X Yes N NA MYesE]NoONA E Yes No <br /> Was sensor properly replaced and � � <br /> verified functional after testing? X❑Yeso N� ❑NA X Ye N ❑NA X Ye NcF] ❑NA X yes❑N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> last set of data is for troubleshooting only <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to my-917 the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />