Laserfiche WebLink
Executive Order VR-202-D <br /> Healy Phase 11 EVR System <br /> Including Veeder-Root ISD System <br /> Exhibit 3 <br /> Part 1 - Healy Manufacturing Performance Standards and Specifications <br /> The Healy Phase II EVR System Including Veeder-Root ISD and all components shall <br /> be manufactured in compliance with the performance standards and specifications in <br /> CP-201 (amended May 25, 2006), as well as the requirements specified in this <br /> Executive Order. All components (Exhibit 1) shall be manufactured as certified; no <br /> change to the equipment, parts, design, materials or manufacturing process shall be <br /> made unless approved in writing by the Executive Officer or Executive Officer delegate. <br /> Unless specified in Exhibit 2 or in the ARBApproved Installation, Operation and <br /> Maintenance Manual, the requirements of this section apply to the manufacturing <br /> process and are not appropriate for determining the compliance status of a gasoline <br /> dispensing facility. <br /> 1. NOZZLES <br /> Every nozzle shall be tested at the factory. Every nozzle shall have affixed to it a <br /> card or label stating the performance specifications listed below, and a statement <br /> that the nozzle was tested to, and met, the following specifications. <br /> a. The nozzle vapor valve leak rate shall not exceed 0.038 cubic feet per <br /> hour(CFH) at a pressure of+2 inches H2O when tested in accordance <br /> with the latest version of TP-201.2B. <br /> b. The nozzle vapor valve leak rate shall not exceed 0.10 CFH at a vacuum <br /> of-100 inches H2O when tested in accordance with the latest version of <br /> TP-201.28. <br /> C. The nozzle automatic shut off feature is tested at all service clip settings <br /> (either two or three) as well as handheld in accordance with Underwriters <br /> Laboratories (UL) Standard 842. <br /> d. The nozzle is tested in accordance with the California Department of Food <br /> and Agriculture Division of Measurement Standards Article 2 (DMS 6-6- <br /> 97). <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 3—VR-202-D <br />