Laserfiche WebLink
-2- <br /> e. The nozzle is manufactured to the specifications that passed all tests <br /> conducted during the ARB certification for the following: <br /> TP-201.2C - Spillage from Phase II Systems <br /> TP-201.2D - Post Fueling Drips From Nozzles <br /> TP-201.2E - Gasoline Liquid Retention in Nozzles and Hoses <br /> f. The nozzle is manufactured to meet the Vapor to Liquid Ratio as specified <br /> in Exhibit 2. <br /> g. The terminal end of each nozzle shall be manufactured in accordance with <br /> the specifications referenced in Section 4.7.3 of CP-201. <br /> 2. INVERTED COAXIAL HOSES <br /> a. Every inverted coaxial hose is tested for continuity and pressure tests in <br /> accordance with UL Standard 330. <br /> 3. HOSE ADAPTORS <br /> a. Every hose adaptor is tested for continuity and pressure tests in <br /> accordance with UL Standard 567. <br /> 4. RECONNECTABLE BREAKAWAY COUPLINGS <br /> a. Every reconnectable breakaway coupling is tested for continuity and <br /> pressure tests in accordance with UL Standard 567. <br /> 5. FLOW LIMITER <br /> a. Every flow limiter is tested to 50 pounds per square inch (psi) liquid <br /> pressure to verify maximum gasoline flow rate limited to 10.0 gpm. <br /> 6. VP1000 VACUUM PUMPS <br /> a. Every vacuum pump is pressure tested in accordance with UL Standard <br /> 79. <br /> b. Every vacuum pump is manufactured to the exact specifications that <br /> passed all tests conducted during the ARB certification. <br /> C. Every MC100 control module is tested in the factory to verify proper <br /> operation. <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 3—VR-202-D <br />