My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 5 <br /> Vapor to Liquid Volume Ratio <br /> (Executive Orders VR-201-D and VR-202-D) <br /> (Healy Model 900 EVR Nozzle) <br /> Definitions common to all certification and test procedures are in: <br /> D-200 Definitions for Vapor Recovery Procedures <br /> For the purpose of this procedure, the term "ARB" refers to the California Air Resources <br /> Board, and the term "Executive Officer' refers to the ARB Executive Officer, or his or her <br /> authorized representative or designate. <br /> 1. PURPOSE AND APPLICABILITY <br /> 1.1 This test procedure is used to quantify the Vapor to Liquid (V/L) Volumetric <br /> Ratio of the Healy Model 900 EVR Nozzle installed at gasoline dispensing <br /> facilities (GDF). This procedure provides a method to determine compliance <br /> with the V/L requirements specified in ARB Executive Orders (EO) VR-201-D <br /> and VR-202-D. <br /> 2. PRINCIPLE AND SUMMARY OF TEST PROCEDURE <br /> 2.1 A tight fitting adaptor is placed on the spout of a dispensing nozzle. The <br /> adaptor, which isolates vapor flow to the nozzle vapor collection ports, is <br /> connected to a volume gas meter. Gasoline is dispensed through the nozzle <br /> and the volume of vapors drawn through the vapor collection boot by the <br /> Phase II system vacuum pump is measured. The volume of vapor is recorded <br /> and compared with the volume of gasoline dispensed to determine the V/L <br /> Volumetric Ratio. <br /> 2.2 The test is conducted with the pressure/vacuum (P/V) vent valve(s) installed <br /> on the storage tank vent pipes. <br /> 2.3 The test procedure requires no modifications to the GDF being evaluated. <br /> 2.4 The test procedure may be conducted on a fueling point on one side of the <br /> dispenser with the other side of the dispenser either authorized to dispense <br /> fuel (but not dispensing), or with the other side dispensing fuel into a vehicle <br /> or another portable test tank. Conducting the test this way will be evaluating <br /> the V/L of the fueling point with the VP1000 vacuum pump running on its high <br /> speed setting. <br /> 3. BIASES AND INTERFERENCES <br /> 3.1 Nozzle spouts that are damaged such that the V/L adaptor cannot fit over the <br /> nozzle spout preclude the use of this test. <br /> Healy Model 900 Nozzle V/L Test Procedure, Exhibit 5—Executive Orders VR-201-D and VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.