My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> 3.2 Refueling points not capable of achieving dispensing rates (see Equation <br /> 9-2) required for conducting the V/L test, as specified in Exhibit 2 of ARB <br /> Executive Orders VR-201-D and VR-202-D, preclude the use of this test for <br /> determining in-use compliance of certified systems. <br /> 3.3 Bagging, or otherwise sealing any nozzle associated with the vacuum <br /> pump serving the nozzle being tested, may bias the test results towards <br /> compliance. The V/L test to verify compliance shall be conducted without <br /> "bagging" any of the nozzles served by a common vacuum device. <br /> 3.4 if the nozzle being tested introduces liquid into the V/L adaptor, gas volume <br /> meter or the adaptor supply hose, the V/L of that nozzle shall be deemed a <br /> failure of the WL standard. <br /> 3.5 Do not drain or remove liquid in either the vapor passage of the hoses or the <br /> dispenser vapor piping prior to performing the test. Draining of this liquid <br /> gasoline will bias the test toward compliance. <br /> 3.6 The 0-ring in the V/L adaptor that is not properly lubricated may bias the <br /> results toward noncompliance. See Section 5.7 for lubrication requirements. <br /> Motor oil (any weight) is acceptable for lubricating the O-ring. Contact Healy <br /> Technical Services with any questions about other lubricants that may be <br /> used in conducting this test. <br /> 3.7 Conducting V/L testing with an improperly conditioned portable test tank <br /> (not saturated with gasoline vapors) will bias the test results of the as found <br /> V/L of the fueling point. Refer to Section 6.6 for proper portable test tank <br /> conditioning. <br /> 4. SENSITIVITY, RANGE,AND ACCURACY <br /> 4.1 The maximum rated capacity of the gas volume meter shall be at least 800 <br /> CFH and not greater than 3,000 CFH. <br /> 4.2 The minimum rated capacity of the gas volume meter shall be 25 CFH. <br /> 4.3 The minimum readability of the gas volume meter shall be 0.01 cubic feet. <br /> 4.4 Accuracy, determined during calibration, will be ± 5 percent of the gas volume <br /> meter reading. <br /> Healy Model 900 Nozzle V/L Test Procedure, Exhibit 5—Executive Orders VR-201-D and VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.