My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
INSTALL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:20:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\2003 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Product piping will be flushed with water and again pumped dry prior to removal. All collected <br /> fuel and wash water will be placed in DOT approved 55-gallon containers and stored on-site for <br /> subsequent manifesting and disposal. Universal Environmental of Benicia, CA will haul <br /> generated liquid wastes for offsite disposal. Liquid wastes will be disposed/recycled at Crosby <br /> and Overton in Oakland California. Once decontaminated, existing primary fuel lines will be <br /> pulled from their ducts and hauled for off-site disposal by Glacier as solid waste. Solid waste will <br /> be disposed of at the Forward Landfill in Manteca, California. <br /> During removal of the primary fuel pipes, copper wire will be pulled into the secondary <br /> containment ducts to allow locating with electromagnetic equipment. Glacier will saw-cut, break <br /> and remove concrete over the existing lines and excavate for removal. Removed duct will be <br /> decontaminated as necessary and hauled to the Forward Landfill for solid waste disposal. <br /> Concrete will be similarly cut and removed around dispenser and tank sumps. Soil will be <br /> excavated to expose tanks sump penetrations and replace under dispenser containment. <br /> Concrete will be similarly saw-cut, removed and excavation completed for installation of Phase 1 <br /> EVR. Broken concrete will be loaded to a Glacier truck for transportation to the Forward landfill in <br /> Manteca, California <br /> • Excavated soil will be stockpiled and covered on-site and reused during backfill. 7-Eleven's <br /> environmental consultant will sample stockpiled soil, soil along the existing pipe alignment and <br /> below removed dispenser sumps. Soil sampling, profiling and disposal (if required) will be as <br /> described in the enclosed Workplan for Soil Compliance prepared by Seacor International, Inc. <br /> • New EnvironTM" coaxial pipe will be installed in the trenches excavated for removal of the existing <br /> pipe. All containment sump boots will be replaced with EnviroTM. Catalog cut sheets for the <br /> proposed EnvironTm products are attached for your review. Electrical conduits will be temporarily <br /> removed and reinstalled with new entry boots by a licensed electrical contractor. <br /> • All installed components including the existing dispenser and turbine sumps will be field tested by <br /> Glacier prior to agency inspection. Glacier will provide the agency with adequate notice for pre- <br /> burial inspection. <br /> • Following inspection of below grade completion, excavations will be backfilled, compacted and <br /> concrete restored to match existing. Dispensers will be set, lines purged and the gas facility <br /> reopened. <br /> • Glacier will coordinate with Tanknology Northwest for completion of tank, line and sump testing <br /> upon completion of site work. <br /> This workplan has been prepared by Glacier for agency use in reviewing and approving the enclosed <br /> permit application(s). Please contact Steve Miles if you have any questions, comments or concerns. Our <br /> toll free number is 1-800-275-1701. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.