My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
INSTALL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:20:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\2003 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Whenever the tanks are stored at the site,chock them in place to WARNING:When the tank is under pressure,the manways and/or <br /> prevent rolling.(See Figure 1-2).Tie them down if high winds are fittings may dislodge or the tank may rupture and result in death, <br /> expected. severe personal injury,or property damage.Before beginning the <br /> j After delivery and before pre-installation testing,visually inspect test notify all people on the test site to remain in a safe location. <br /> the entire exterior surface of the tank for signs of damage(holes, ALWAYS ATTENDTHETANK DURING THE TEST.Avoid extended <br /> cracks or deep scrapes). exposure to the manways,fittings and ends of the tank during <br /> the test. <br /> Verify that all of the safe-delivery provisions of the Xerxes"Damage CAUTION:The maximum test pressure is 5 PSIG(3 PSIG when <br /> Free Delivery'program have been followed.Sign the drivers testing a twelve-foot tank). <br /> release form. <br /> HE <br /> 111111 RE IIII <br /> IIIIIMAXIIII <br /> IIII I 5 PSIG II <br /> II- 11 I = 11 <br /> FIGURE 1.2 111111 � � 8 1 111111 <br /> =111112 1 <br /> 2. MEINSTALWJONTIESTINO*', <br /> NI Xerxes tanks are tested prior to shipment but it is required that <br /> all tanks be tested prior to installation in order to verify the absence <br /> of shipping and handling damage. In the unlikely event of a leak,it <br /> is most likely to develop at a manway or a fitting.After installation <br /> and before backfilling to grade,the test must be repeated to verify 1. Open one service fitting.Check to see that all remaining service <br /> that no damage has occurred during installation.Refer to the 1. s are property doped,plugged and tightened. <br /> appropriate section below for the instructions for testing a single 9 p p y p p gg <br /> wall tank,a double wall tank with a dry interstitial space or a double 2. Install the test manifold in the open service fitting.Connect the <br /> wall tank with a liquid-filled interstitial space. pressure source to the test manifold.(See Figure 2-2). <br /> If damage is detected,DO NOT ATTEMPT REPAIRS.Contact the 3. Pressurize the tank to 5 PSIG(3 PSIG when testing a 12-toot <br /> UST Coordinator at the Xerxes plant nearest you or the Technical tank).Add or remove air as necessary and allow the pressure <br /> Service Department at Xerxes'corporate office.Telephone numbers to stabilize. <br /> are found on the last page of this manual. 4. Close the valve on the test manifold.Disconnect the air <br /> Construct a test manifold as shown in Figure 21.The air supply supply line. <br /> gauge must have a maximum full-scale reading of 15 PSI with 1/4 5. Monitor the pressure for one hour.Soap the entire exterior of <br /> or 1/10 Ib. increments.The pressure relief valve must be rated at a the tank and watch for active air bubbles which indicate a leak. <br /> maximum of 6 PSI (4 PSI for 12-foot tanks)to reduce the risk of <br /> overpressurizing the tank.The tester is responsible for verifying 6. When the test is complete,carefully release the air pressure <br /> that all of the test equipment is in good working condition and from the tank by opening the air supply valve.The air supply line <br /> property configured. should already have been disconnected.Remove the test manifold. <br /> FROM COMPRESSOR <br /> FROM COMRESSOR <br /> AIR SUPPLY VALVE PRESSURE RELIEF DEVICE AIR SUPPLY VALVE <br /> AIR SUPPLY GAUGE <br /> PRESSURE RELIEF AIR SUPPLY GAUGE SERVICE FITTING <br /> DEVICE <br /> SERVICE FITTING <br /> TEST MANIFOLD <br /> FIGURE 21 FIGURE 2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.