Laserfiche WebLink
0 <br /> Z. Open the monitor felting not connected to the hose hardware. <br /> 11 : <br /> 3. Pressurize the primary tank to 5 PSIG;add or remove air as <br /> NDTE:Your tank may arrive on site with a hose/vatve assembly(see Figure 2-3 HV) necessary and allow the pressure to stabilize.Close the valve on <br /> or with a Quick Disconnect assembly(see Figure 2-3 OD).If the tank is not the test manifold supply line. <br /> configured as shown in one of the illustrations prior to preinstallation testing,call <br /> the Xerxes'coordinator at the plant nearest you or the technical services department 4. Monitor the pressure for one hour.Soap test all service fittings <br /> at xerxes!headquarters. and manways.Watch for active air bubbles which indicate a leak. <br /> HOSE/VALVE ASSEMBLY <br /> NOTE:In order to test the tank,the hoseAdve assembly must be connected from a NYLON TIE <br /> monitor felting to a service felting. <br /> PRIMARY(INTERNAL)TANK TEST I PRESSURE RELIEF DEVICE <br /> i ' <br /> 1. Open one service fitting and the monitor fitting which is not �__�, FROM COMPRESSOR <br /> connected to the hose/valve assembly.Check to see that all GUrCK DISCONNECT AIR SUPPLY VALVE <br /> remaining service and monitor fittings are properly doped,plugged ASSEMBLY AIR SUPPLY GAUGE <br /> and tightened. MONITOR FITTING SERVICE FITTING <br /> 2. Close the valve on the hose/valve assembly.Install the test <br /> manifold in the open service fitting.Connect the pressure source <br /> to the test manifold.(See Figure 2-3 HV). <br /> 3. Pressurize the primary(internal)tank to 5 PSIG.Add or FIGURE 2-3 QD <br /> remove air as necessary and allow the pressure to stabilize.Close <br /> the valve on the test manifold. SECONDARY(EXTERNAL)TANKTEST <br /> 4. Monitor the pressure for one hour.Soap all fittings and man- 1. Maintain the pressure in the primary tank. <br /> ways and watch for active air bubbles which indicate a leak. 2. Plug the monitor fitting which was previously open.See Step 2 <br /> (Quick Disconnect Assembly Primary Tank Test). <br /> PRESSURE RELIEF DEVICE 3. Free the hose from the service felting by cutting the nylon tie. <br /> HOSE/VALVE ASSEMBLY <br /> FROM COMPRESSOR 4. Insert the hose into the quick disconnect check valve(found at <br /> AIR SUPPLY VALVE the top of the service fitting).This will allow air to transfer from the <br /> MANIFOLD VALVE AIR SIMPLY GAUGE primary to secondary tank. <br /> MONITOR FITTING SERVICE FITTING 5. Pressurize to 5PSIG.Add or remove airvia the supply valve as <br /> needed and.allow the pressure to stabilize.Close the valve on the <br /> test manifold.Disconnect the air supply line. <br /> 6. Monitor the pressure for one hour.Soap the entire exterior of <br /> the tank and watch for active air bubbles which indicate a leak. <br /> FIGURE 2-3 HV When the test is complete,carefully release the air pressure from <br /> SECONDARY(EXTERNAL)TANK TEST the tank by opening the supply valve.The air supply line already <br /> should have been disconnected.When the air flow from the supply <br /> CAUTION:Do not pressurize the secondary tank(interstitial space) valve stops,remove the test manifold. <br /> directly or the primary tank may rupture and cause tank failure. <br /> Once the valve on the hose/valve assembly has been opened,do i 2c. DOUBLE WALL TANK WITH LIQUID-FILLED <br /> not close it until all testing is complete and all test pressure has INTERSTITIAL SPACE <br /> been released. <br /> 1. Maintain the pressure on the primary tank Plug the monitor PRIMARY(INTERNAL)TANK TEST <br /> fitting which was previously open.Slowly open the valve on the NOTE Keep the tank vertical(the reservoir on top)during the preinstallation testing <br /> hose/valve assembly and pressurize the secondary(external)tank or the brine may drain from the reservoir. <br /> to 5 PSIG.Add or remove air as needed and allow the pressure to 1. Open one service fitting and the fitting on the reservoir.Check <br /> stabilize.Close the valve on the test manifold.Disconnect the air for liquid in the reservoir—it should be about half full.Do not <br /> supply line. open the monitor fittings—brine will be lost Check to see that all <br /> 2. Monitor the pressure for one hour.Soap the entire exterior of remaining service and monitor fittings are properly doped,plugged <br /> the tank and watch for active air bubbles which indicate a leak. and tightened. <br /> When the test is complete,carefully release the air pressure from 2. Visually check the interior of the tank for liquid—there should <br /> the tank by opening the air supply valve.The air supply line should not be any.Install the test manifold in the open service fitting. <br /> already have been disconnected.Remove the test manifold. Connect the pressure source to the test manifold.(See Rgure 2-4). <br /> 3. Pressurize the primary(internal)tank to 5 PSIG.Add or <br /> QUICK DISCONNECT ASSEMBLY remove air as necessary and allow the pressure to stabilize.Close <br /> NOTE:In order to test the primary tank alone,the test hose must not be connected the valve on the test manifold.Disconnect the air supply line. <br /> to the service fitting—keep the nylon be in place. 4. Monitor the pressure for one hour.Soap all fittings and man <br /> PRIMARY(INTERNAL)TANK TEST ways and watch for active air bubbles which indicate a leak.Check <br /> 1. Connect the test manifold to an available service felting.Check the reservoir for bubbles in the monitor fluid. <br /> to see that all remaining service fittings are properly doped, 5. Release the pressure from the primary tank. <br /> plugged and tightened. <br />