Laserfiche WebLink
D.Results of Testing/Servicing <br /> Software Version Installed: 329.42 <br /> Complete the following checklist: <br /> • Yes No. s the audible alarm operational? <br /> • Yes No* s the visual alarm operational? <br /> • Yes No* ere all sensors visually inspected,functionally tested,and confirmed operational? <br /> • Yes No* ere all sensors installed at lowest point of secondary containment and positioned so that other equipment wifl not interfere with <br /> heir proper operation? <br /> • Yes No* f alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> r N/A <br /> • Yes No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> N/A ystem detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> all that aPPiy)P Sump/Trench Sensors; P Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection?le Yes; r No <br /> • Yes No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no mechanical overfill <br /> Com' N/A prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> o at what percent of tank caeacity does the alarm triq er?90% <br /> Yes* f+ No as any monitoring equipment replaced?If yes,identify specifre sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all re facement parts in Section E below. <br /> Yes* • No as liquid found inside any secondary containment systems designed as dry systems?(s Check all that a 1 <br /> Product- r Water.If es describe causes in Section E below. PP Y) <br /> • Yes No as monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> • Yes No* s all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or wiB be corrected. <br /> E.Comments: <br /> Monitoring System Certification Page 2 of 3 <br /> 12/p7 <br />