My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
11/5/2018 8:25:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2013 TO 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 2 oft <br /> 5.SECONDARY PIPE TESTING <br /> Test Method Developed By: V Piping Manufacturer r Industry Standard r Professional Engineer <br /> Other(Specify) <br /> Test Method Used By: W Pressure Vacuum r Hydrostatic <br /> F Other(Spec) <br /> Test Equipment Used: auge Equipment Resolution- 0 loss <br /> (Tank 6-;pul) (Tank 6-put) <br /> STP Containment 1 to 314, STP Containment 1 to 112, <br /> 718,111€2 5/6,9/10 <br /> Piping Material: dw flex dw flex <br /> Piping Manufacturer: unknown unknown <br /> Piping Diameter: 2 in. 2 in. in. in. <br /> Length of Piping Run: 120 ft. 120 R. ft. ft. <br /> Product Stored: PUL PDI. <br /> Method and location of <br /> piping-run isolation: sump sump <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min min rnin <br /> starting test: <br /> Test Start Time: 09:41:00 09:42:00 <br /> Initial Reading(Rl): 5.00000 PSI 5.00000 PSI <br /> Test End Time: 10:41:00 10:42:00 <br /> Final Reading(RF): 5.00000 PSI 5.00000 PSI <br /> Test Duration: 1 hr I hr <br /> Change in Reading(RF-RI): 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/-0.00000 +/- <br /> Criteria: <br /> Test Result: Pass Pass <br /> COMMentS-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 87 line A-disp 3/4,718, 11112 87 line B-disp 1/2,516,9/10 89 line A-disp 3/4,7/8, 11/12 89 line B-disp 1/2,5/6,9/10 91 line A-1/2,5/6,9/10 <br /> 9f line B-disp 3/4,7/8, 11/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.