My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
11/5/2018 8:25:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2013 TO 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 1 of 1 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: r 'Tank Manufacturer P Industry Standard Professional Engineer <br /> r— Other(Spec) <br /> Test Method Used By: r Pressure r Vacuum F-00 Hydrostatic <br /> F Other(Specify) <br /> Test Equipment Used:VPLT Equipment Resolution:0.00001 in. <br /> STP Containment for STP Containment for STP Containment for <br /> Tank 4 rut-I Tank 5 mu[- 1 Tank 6 pul- 1 <br /> Sump Diameter/Dimensions: 48 in. 48 in. 48 in. <br /> Sump Depth: 70.00 in. 70.00 in. 69.00 in. <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 19.00 22.00 20.00 <br /> Hi hest Piping Penetration: <br /> Height from Tank Top to Lowest 12.00 10.00 12.00 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: good good good <br /> Portion of Sump Tested' 21 24 22 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both r Yes r Nor* NA t" Yes r No f+ NA r Yes r No G NA (" Yes r No NA <br /> product and water)?* <br /> Turbine shutdown response time 00:00:00 sec 00:00:00 sec 00:00:00 sec sec <br /> Is system programmed for fail-safe r Yes r No C* NA r Yes r No C+ NA r Yes l"' No rw NA C Yes 4' No t- NA <br /> shutdown?* <br /> Was fail-safe verified to be r Yes r Nor* NA r Yes r No ro NA r Yes r No f* NA Yes t" No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min min <br /> test <br /> Test Start Time: 11:30:00 11:15:00 11:03:00 <br /> Initial Reading(RI): 0.00000 in. 0.00000 PSI 0.00000 in. <br /> Test End Time: 12:00:00 11:45:00 11:33:00 <br /> Final Reading(RF): 0.00000 in. -0.00100 PSI -0.00040 in. <br /> Test Duration: 30 min 30 min 30 min <br /> Change in Reading(RF-RI): 0.00000 in. -0.00100 PSI -0.00040 in. <br /> Pass/Fail Threshold or Criteria: +/-0.00200 +/-0.00200 +/-0.00200 1- <br /> Test Result: Pass Pius Pass <br /> Was sensor removed for testing2 t: Yes(" No t"' NA f+ Yes C` No C NA to Yes r No r NA r Yes r Nor NA <br /> Was sensor properly replaced and !* Yes(' No(' NA I'+ Yes r No r NA f+' Yes r No I~ NA r Yes r No�f` NA <br /> verified functional after testing? <br /> Comments 7(include information on repairs made prior to testing,and recommended follow-up for failed rests) <br /> t If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an asterisk(*)is"NO"or"NA",the entire sump <br /> must be tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.