Laserfiche WebLink
SWIl January 2002 Page 2 of 2 <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) T€STING <br /> Test Method Developed By: r UDC Manufacturer G Industry Standard f Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: r Pressure r vacuum re Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: F_V_PL_T7 Equipment Resolution: 0.00001 in.� <br /> UDC #9/10 i UDC #11/12 j UDC# UDC# j <br /> UDC Manufacturer: I gilbarco E gil'barco <br /> UDC Material: Fiberglass Fiberglass <br /> UDC Depth: 35.00 35.40 <br /> Height from UDC Bottom to Top of 13.00 13.40 <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Lowest 55.04 5.04 i <br /> Electrical Penetration: I <br /> Condition of UDC prior to testing: good good <br /> Portion of UDC Testedl I S 15 <br /> Does turbine shut down when UDC <br /> sensor detects liquid(bath product and I Yes r l* NA r Yes r No NA r Yes r No r NA r Yes r Nor NA <br /> water)7' <br /> r <br /> Turbine shutdown response time 00:00.00 sec 00:00:00 sec se[ sec <br /> Is system programmed for fail-safe <br /> shutdown)'% r Yes r No f: NA f Yes f No f+ NA Yes r No r NA r Yes(_ No r NA <br /> wn <br /> Was fail-safe verified to be operational?" r Yes r No f2 NA r Yes r No l' NA r Yes r Nor NA r Yes r Nor NA <br /> Walt time between applying 5 min 5 min min min <br /> pressurelvacuum/water and starting test <br /> Test start Time: 14:22:00 14:22:00 <br /> Initial Reading(RI): 4.00000 In. 0.00000 In. <br /> Test End Time: 14:37:04 14:37:00 <br /> Final Reading(RF): 0.00030 In. 0.00030 in. <br /> Test Duration: <br /> Change in Reading(Rr-RI)r 0.00030 in. 0.00030 in. <br /> Pass/Fail Threshold-Criteria; +/- 0.40200 +/-0.00200 +/- +/- <br /> Test Result: i Pass pass <br /> i <br /> Was sensor removed for testing? re Yes r No r NA G Yes r Nor NA r Yes r Nor NA r Yes r No r NA <br /> Was sensor properly replaced and <br /> verified functional afertesting? G Yes r¢ No NA rs Yes r Nor NA r Yes�°"� No r' NA r Yes(' N9 f' NA <br /> Comments ?(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk(•)Is?NO?or?NA?, the <br /> entire UDC must be tested. <br />