Laserfiche WebLink
SAN JOA > tN COUNTY ENVIRONMENTAL HEALTH DE . RTMENT <br /> UNDERGROUND grORAGE TANK <br /> MONITORING PLAN -PAGE 1 <br /> X954. <br /> TYPI'z OF ACTION ❑ 1.7EW PLAN 0 2.CFIANGE OF INFORMATION <br /> PLAN TAPE H MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. <br /> (Check ant itcrrt altly) Q THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S}. <br /> I. FACILITY INFORMATION <br /> F <br /> ACILITY ID#(.AgmcY Use!dY) <br /> M6`x <br /> 'Y NAME SFIL'LL OIL PRODUCTS US <br /> SITEADDRESS 3515 NAVY DRIVE CITY STC3CKTQN <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> like€eak detectors.etc.}be mined in M06. <br /> State Iaw,equims that t^.,4titi�,prevsriiivt maintenance.wid calibration of monitoring equipment(e.g.,Setisars probes <br /> accordaitce with the equipment Manufacmrm'iustractiaiu,01'arrmtlzdly,%vhichever is mm,frequent. Such work must be performed by qualified personnel. ia07. <br /> MONITORING FQUIPM 'T IS SERVICED 1.ANNUALLY ❑ 99-OTHER(Specify): <br /> III. ?MONITORING LOCATIONS <br /> Thmonplan must iticttulc a Site flan slloKing the jimal tame and pipr.ng layouts and the location Wun nlonitering is perfnrrned(i.e.,fot«tts <br /> is itoring on of each sensor. <br /> litre leak detmzor,monitoring system cantm I paml,tic.). If yott already have a diagram(e.g..current UST ivlonitonng Site Plttm from a Manitta�srig System Certi9 tertian <br /> form.Hazardous Materiels BueirlrM,ME maL etc.)'hich$host-'atl tared infcsmatian inciride it twth this plats. <br /> IV. TANK MONITORING <br /> ;4110. <br /> MOiI1TORING IS I'ERFC)RiEi?US1NdG TILE FOLLOVJIh3G Nt4ETHOD(5}:(Click all that apply) <br /> g 1.CONTINUOUS ELEC"TRON"IC\40NITORING OF TANK ANWI LAR(INTERST€TIAL)SPACE(S)OR SECONDARY CONTAINMENT VAL'LT(S) hitt. <br /> SECONDARY CONTAIN Mt VT IS <br /> � DRY ❑ b.LIQUID FILLED ❑ c.UNDER PMSiJRE ❑ d UNDER VACUUM <br /> Rol <br /> �f',At�'a raiz MODELX: X76S <br /> PANEL MANUFACTURER: MUS, <br /> to+, MODEL#(S): <br /> LEAK SENSOR NNAN+1'UFAC1'URER: I7 ON A'tI •- <br /> ® ? AUTOMATIC TANK GAUGING(Al i)SYSTEM USED TO MONITOR SIN WALL IA'R.1 16117 <br /> PANEL MANUFACTURER 'ita. MODhL# <br /> ,<tts<, ldiOl?EL�5}: rrliv. <br /> IN-TANk PROBE MANUFACTURER- <br /> LF A K <br /> ANUFACTURERLFAK TFCTFRE[iUENLY: L❑ a CONTINUOUS ❑ b.DAILY/NIGRrrLY ❑ c.WEEKLY <br /> u[I1 <br /> d.N40NIFITLY ❑ e.OTHER€Specify}, <br /> PROGRAMMED TEST& ❑ a 0.1 a.p.h. ❑ b.4.2 g p.h ❑ c.OTHER(Specify): spa. <br /> ® 31 IIa VF.N 1"r()RY RECO'NCILAATION [] �MANUAL PER 23 CCR§2646 ❑ b.STATIS'TTCAL PER 23 CCR 12f146.i <br /> ® 4,WEEKLY MANUAL TANK GA{tGING(MTG)PER 23 CCR§2643 � <br /> TESTING PERIOD: 0 a 36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§x..643.1 W M77. <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.BIWNIALLY ❑ c.OTHER(Speci4-), <br /> ❑ 6NISIIAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(itawa-no--v —A) WI& <br /> E] 99,OTHER(Specify): . <br /> V. PIPE MONITORING <br /> waw <br /> MONITORING IS PERFORMED USING THE FOLLOA ANG A4ETHOD(S)(Check all that apply) <br /> P4 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMNSYMENCH(ES)AND OTHER SECONDARY CONTALNMENT <br /> SECONDARY CONTAINSII IT IS: a DRY ❑ b LIQUID FILLED © c.UNDER PRESSURE ❑ d UNDER VACUUM <br /> PANEL MA1'4MCTURER � MODEL#: <br /> F;ON�.N N+RODEL#(S11 LS-3A <br /> LEAK SENSOR MANUFACTURER: u� <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e..TURBINE)SHSTDOWN'1 ❑ a.YES [:1 b.NO <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER Ali 170MAT IC PUMP SHUTDOWN" [] a.YIS ❑ b.NO <br /> [12,MECHANICAL LINE LEAK DETECTOR Q&LD) THAT ROUTINELY PERFORMS 3A g p.h LEAF- TESTS AND RESTRIC!S OR SHUTS OFF <br /> PRODUCT FLOW WHIR;A LEAK IS DETECTED yrs. <br /> MLLD MANdUFACTURER(s}: N13' MODEL#(S); <br /> ❑ 3.F-LZCTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0&p-h.LEAK TESTS <br /> '.A4o. MODL-L gi hsat. <br /> ELLDN+4ANUFAC.'TURER: yua <br /> PROGRAMMED INE INTEGRITY TESTS: ❑ a MINI14UM MONTHLY 0.2 gp.h. [) b.MINIMUM ANNUAL 0.1 g p.h. <br /> t t3. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC FUMP SHUTDOWN? E] a ASS (I b. M44- <br /> WILL <br /> uWILL ELLD FAILURE1DISCONt'NECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES 0 b•NO <br /> Q 4.IN"rEGRITY'I"ES'NG uss <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ❑ rw$ 0.1y pff HSC <br /> 5.VISUAL MONITORING DONE: C] a.DAILY b,WEEKLY' Cl c.nll 4_RtONTfTLY k F BCH TI SAY i.sttrx3l <br /> Albuss9 was tmj or mat mwVa emcy genr.F <br /> ❑ Prn <br /> 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR 42635(a)(3) <br /> [] 3.No PRODA CT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) M48. <br /> ❑ 99.OTHER(Specify) <br /> 07J33r1U3 <br /> SJCE.R D-d(071U3)-1/4 <br />