My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
4051
>
2300 - Underground Storage Tank Program
>
PR0231868
>
COMPLIANCE INFO 1987-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:52:41 PM
Creation date
11/5/2018 10:43:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2011
RECORD_ID
PR0231868
PE
2361
FACILITY_ID
FA0004045
FACILITY_NAME
AT&T California - UER47
STREET_NUMBER
4051
STREET_NAME
NEWTON
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
4051 Newton Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\N\NEWTON\4051\PR0231868\COMPLIANCE INFO 1987-2011 .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/46/01 <br /> r <br /> Turbine 1 Piping Sumps: <br /> 1. Remove sensor from program and remove sensor. <br /> 2. Monitor Sump for hazardous conditions, 02 or LEL. Maintain below LEL <br /> 3. Inspect for open, broken or defective electrical fittings and repair <br /> 4. Clean solid waste from sump and place in 5 gallon labeled waste pail <br /> 5. Add water to a level 2" above piping penetrations <br /> 6. Measure depth of water in sump and adjust telescoping tube on testing <br /> probe to center probe rod at water level <br /> 7. Install testing probe and avoid getting float wet above waterline. Clamp <br /> probe to support stand <br /> 8. Zero digital meter once level stabilizes <br /> 9. Sump fails if level change on 24 minute test is greater then .004 inches <br /> 10.If the change of level during the test is '/4" or less, allow the fluid <br /> temperature to stabilize for 1 hour and retest <br /> 11 . Locate leaks, repair and retest if possible <br /> 12. Pump out water and retain as testing fluid <br /> 13.Vacuum dry and confirm sensor operation <br /> 14.Reinstall sensor and re-program monitor <br /> 15. Repeat for each turbine sump <br /> Product Line Secondary. <br /> 1 . Identify product line secondary containment manufacturer <br /> 2. Connect test boot to the secondary penetration in the piping/turbine sump <br /> 3. Connect test equipment to the secondary test fitting <br /> 4. Pressure the system to 1 psig and check all fittings for leaks <br /> 5. Continue pressurizing and follow manufacturers testing procedures <br /> 6. Repeat for all other line secondary containment <br /> Tank Annular Space. <br /> 1. Identify the tank manufacturer <br /> 2. Remove or isolate the annular space sensor so it will not be damaged <br /> 3. Follow all of the tank manufacturers test procedures. <br /> Test Equipment: <br /> 1 . Level Probe — Temposonics LH series probe (see attached sheet for <br /> details) <br /> 2. Meter for Probe — Temposonics TDU — 100 meter <br /> 3. Digital Pressure Gage for Line secondary testing <br /> 4. Dial Vacuum Gage for Tank Annular Space testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.