Laserfiche WebLink
BANKS &CO. <br /> The proposed console will be connected to the existing wiring. <br /> The wiring will be changed to fit the new console and <br /> dispenser requirements . The console will be set on the <br /> counter and arranged as needed for proper operation. <br /> OVERHEAD CANOPY <br /> The overhead canopy is to be installed by the canopy <br /> manufacturer' s installer. The installers will be required to <br /> use the appropriate PPE for the job they will be doing. <br /> GENERAL SAFETY SPECIFICATIONS <br /> SITE SAFETY <br /> Banks & Co. has the responsibility for the safety of all <br /> personnel involved in the performance of work for each job. <br /> Banks & Co. also has the responsibility for preventing <br /> persons form entering the work site, excepting employees and <br /> other persons involved in the performance of the work. <br /> Barricades and caution tape will be used to prevent the public <br /> from entering the work area . <br /> Banks & Co. has the responsibility for compliance with safety <br /> and health standards prescribed under the California <br /> Occupational Safety and Health Act, California Administrative <br /> Code, Title B . <br /> It shall be Banks & Co. responsibility to keep the excavated <br /> work site barricaded or closed to prevent entry by <br /> unauthorized persons, to be responsible for passage of Banks <br /> & Co. personnel or equipment, and to assure that those <br /> permitted to enter are aware of the hazards and familiar with <br /> the safety precautions to be followed. <br /> Specific Requirements : <br /> 1 . A temporary barricade shall be erected a minimum of 6 feet <br /> from the outer expected limit for excavation activities . <br /> The barricade will consist of a minimum 4 feet high <br /> continuous barrier. Signs will be erected stating, <br /> "NO SMOKING" . <br /> 2 . Appropriate Personal Protective Equipment , hard hats, <br /> safety glasses and steel-shank and toed boots must be worn <br /> at all times within the barricaded area. <br /> 12 SITE SAFETY PLAN <br />