Laserfiche WebLink
"A" SIDE OF <br /> O CONTAINMENT DISPENSER <br /> DISPENSER C B UNDERNDIIENTNSER DISPENSER F 1-1/2" VAPOR(SHEAR <br /> E <br /> 34 34 TDW/ <br /> IMPACT VALVE SHEAR SECTION <br /> STABILIZER BAR UNLEADED TK3-3 TK3-3 STABIDZER BAR MUST BE FLUSH <br /> ASSEMBLY PREMIUM ASSEMBLY TOP OF CONCRETE DRIVE SLAB TOP OF PUMP ISLAND) <br /> 92 OCTANE UNLEADED VAPOR DISPENSER ISLAND 39 <br /> 87 OCTANE UNL PREM UNLEADED RECOVERY <br /> 0 92 OCTANE 87 OCTANE .. <br /> VAPOR 1-1/2" x 1" n .•:' a ,•.'' •. P • .•. P <br /> RECOVERY REDUCER BUSHING <br /> I I <br /> ° I I ° ° N BULKHEAD FITTING 37 1-1/2"x3" NIPPLE o- _� •> � <br /> I I .SAND OR PEAGRAVEL 1-1/2" COUPLING o •L- L- <br /> LoM <br /> I 32 1-1/2" FLEX CONNECTOR 31 1-1/2-RECOVERYSTAGE <br /> ER11 VAPOR .`BACKFILL <br /> o i i i (TYP. 3 PL(:S.) SHEAR IMPACT VALVE 32 1-1/2"x24" FLEX CONN. O <br /> s y. <br /> A 32 <br /> 1-1/2- FLEX 'n -- —2" BELL x MALE _� (0 <br /> CONNECTK3-3 TK3-3 ___ _ __ (TYP. 3TPLCS.) 'P - P V 2" FIBERGLASS O <br /> 45° ELBOW 34 UNDER DISPENSERd- <br /> "B" SIDE OF 2" BELL x MALE 3" FIBERGLASS TEE W/ CONTAINMENT SUMP Q L <br /> Q� <br /> (INSIDE SUMP) 2" REDUCING BUSHING + r, <br /> DISPENSER �- NATIVE SOIL (n o � <br /> EDGE OF TRENCH <br /> - - - - � - - - - - - -' ° - - - + ° c� <br /> 3" FIBERGLASS STAGE II PO '> <br /> ° VAPOR RECOVERY PIPE <br /> NOTE: SEE TK4-3 FOR17 o <br /> VAPOR RECOVERY <br /> ° — MATERIAL LIST O <br /> LINE ° Vapor Recovery Piping at Dispenser � •(1, 1 <br /> 0 0 2" FIBERGLASS 45' ELL. (TYP.) • 0 <br /> 21 <br /> PRODUCT _ ° ° ° �J o <br /> LINE ° 0 3" FIBERGLASS TEE (TYP.) 30 1-1/2" PRODUCT EMERGENCY B NOT TO SCALE: Q (�J <br /> o EA <br /> W/ 2" REDUCING BUSHING SH R IMPACT VALVE <br /> r_j0 0 0 DOUBLE POPPETED <br /> PRODUCT (TYP. 2 PLCS.) ® ' O <br /> LINE - - - / � M_ m THIS IS A VIEW FROM "B" SIDE OF DISPENSER 1-1(42" IMPACT VALVE W/ UNION TOP 3o t <br /> ((SH R SECTION MUST E FLUSH <br /> NOTES: W/ TOP OF PUMP ISLAND) Of C Q <br /> 1. VAPOR LINES TO SLOPE FROM DISPENSERS TO TANKS 1/8" "B" SIDE OF DISPENSER ISLAND 39 ._- <br /> I PER FOOT MIN, TOP OF CONCRETE DRIVE-SLAB DISPENSER Q) U <br /> 2. THE VAPOR RECOVERY SHEAR VALVE SHALL BE A TOP ENTRY VALVE. <br /> SEE SECTION B ON THIS SHEET L <br /> 21 2" FIBERGLASS PRIMARY PIPE (TYP.) EDGE OF TRENCH . . . . . . •. <br /> 3. ALL SHEAR VALVES SHALL BE SECURELY MOUNTED TO THE STABILIZER • 4 • 9 P P <br /> 2p 3" FIBERGLASS SECONDARY PIPE (TYP.) BAR ASSEMBLY TO ASSURE VALVES WILL TRIP AND OR SHEAR UPON AN c <br /> IMPACT ON THE DISPENSER OF DESIGN CONDITIONS. d d ' L <br /> 3" FIBERGLASS TEE AND C B 4. ALL UNDER DISPENSER CONTAINMENT SUMPS AND FITTINGS ARE PLUMBED BY * ' 'd ° .d 3 <br /> 3" FIBERGLASS 45" ELL. (TYP.) . TK3-3 TK3-3 THE CONTRACTOR. °Aon COMPRE SIO _ <br /> CLAMP (STYP.� <br /> (SECONDARY) 5. THE LOCATION OF THE PRODUCT AND VAPOR RECOVERY PIPING STUB-UPS SHALL SAND OR PEAGRAVEL 1-1/2"x3" NIPPLE •� <br /> BE AS SHOWN CONTRACTOR IS RESPONSIBLE FOR CORRECT ORIENTATION BULKHEAD FITTING 36 <br /> OF THE STUB UPS TO THE DISPENSER. ANY ADJUSTMENTS OF THE INTERNAL WORKINGS BACKFILL 1-1/2" COUPLING 'I'- J <br /> OF THE DISPENSER TO ACCOMMODATE INCORRECTLY INSTALLED PIPING WILL BE AT --- - <br /> Plan View Detail ( Blending ) _CONTRACTORS OWN EXPENSE. v _ 32 1-1/2"44" FLEX CONN. <br /> Three Product MPD Piping n Section Shear Valve Section <br /> 1 1 _ 2" BELL x MALE .— <br /> /^1 ^ _� (PRIMARY PIPING) -{-- <br /> NOT TO SCALE: NOT TO SCALE: <br /> P P V 34 UNDER DISPENSER <br /> 11 3'x2" TEST REDUCER CONTAINMENT SUMP U <br /> ._ <br /> DISPENSER AUXILIARY +- <br /> JUNCTION BOX (INTERCOM) -0 <br /> "A" SIDE OF NATIVE SOIL 0 <br /> "B" SIDE OF' DISPENSER O 0 V) <br /> DISPENSER <br /> DISPENSER N LO <br /> JUNCTION BOX _ <br /> V) - <br /> --�-MULTI-PRODUCT <br /> DO <br /> ISPENSER 26 NOTE: SEE TK4-3 FOR rn C- <br /> 1-112" IMPACT VALVE W/ UNION TOP CO MATERIAL LIST V®�- �' <br /> FA BE � "� <br /> SHEAR SEF PUMP ISL FLUSH Product Piping at Dispenser <br /> / TOP OF PUMP ISLAND) SEAL OFF <br /> THREADED CAPSPLASH GUARD _ V "Z5 •O m <br /> GASOLINE RESISTANT SEALANT OFF v <br /> AROUND BASE OF DISPENSER O NOT TO SCALE: 4) t <br /> 6" RAISED FULL RADIUS DISPENSER ISLAND 0 <br /> SEE DETAIL #17 ON TK3-4 O _ <br /> O ® o <br /> TOP OF CONCRETE DRIVE SLAB 4 4 P P COMPACTED SAND OR I m <br /> a ° o o ' PEAGRAVEL BACKFILL V) O _ •.- <br /> _ t <br /> d . ° ° ° ° '° . 6" BASE OR SURFACE <br /> 'a e MATF�RIAL WHERE -TOP OF FINISHED SURFACE :3d° REQ D. BY OWNERS <br /> ° <br /> G <br /> o <br /> °.ENGINEER <br /> a a° de ' v LC)00 •�-� <br /> N Q Q <br /> 21 2" PRIMARY CIO.AMMP E(SNP.) 1-1/2"x3" NIPPLE - -- --- I <br /> O CONTAINMENT PIPE <br /> N <br /> 20 3" SECONDARY 36 BULKHEAD FITTING 1-1/2" COUPLING AND"COMMUNCATON DISPENSER POWER <br /> BLDG. '' <br /> CONTAINMENT PIPE <br /> 32 1-1/2"x24" FLEX CONN. �(1 CONDUIT HOMERUN PER DISPENSER) <br /> 3/4"C, VEEDER ROOT MONITORING tO n <br /> COMMUNICATION CABLE TO BLDG. VAPOR RECOVERY LINE <br /> U ti o <br /> -- --- - --- - - - (ONE CONDUIT PER DISPENSER) z <br /> 12" 7"+_ 7"+_ -2 PRODUCT PIPING LINES 2 _� < <br /> INTERCOM TO BLDG. TYP. a a <br /> \ (ONE CONDUIT PER DISPENSER) a 2 m o <br /> W <br /> 38 0 08NN �S <br /> O <br /> 11 I I <br /> O 3"x2" TEST REDUCER F c U �n �n <br /> 3/4"C, FUTURE ISD SYSTEM NOTE: CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT HOLE AND < � � M M , <br /> 2" BELL x MALE 34 UNDER DISPENSER CONTAINMENT (ONE CONDUIT PER DISPENSER, TRENCHES FROM SURFACE WATER RUNOFF UNTIL PAVING IS REPLACED. H o u <br /> ( ^^� <br /> PRIMARY PIPING SUMP. SIZE TO MATCH HOME RUN PER DRIVE ROW) �' 2 w c <br /> ) DISPENSER FOOTPRINT. F N a o;m <br /> NOTE: 35 <br /> SENSOR. MOUNITMGING Typical Piping in Trench consultantARj40# <br /> UNDER DISPENSER CONTAINMENT SHALL BE EQUIPPED WITH A POSITIVE SHUTDOWN OF SENSOR NOT SHOWN. <br /> ELECTRONIC SENSOR THAT WILL INTERRUPT POWER TO THE DISPENSER. NOTE: NOT TO SCALE: master release date <br /> NOTE: SEE TK4-3 FOR ALL FITTINGS IN UNDER DISPENSER CONTAINMENT SUMP <br /> MATERIAL UST ARE INSTALLED BY THE CONTRACTOR. project master <br /> ELECTRICAL PENETRATIONS ENTER FROM THE "A" SIDE exe date drawn by <br /> VAPOR RECOVERY NOT SHOWN THIS VIEW OF THE DISPENSER. PRODUCT AND VAPOR RECOVERY NO. DATE REVISIONS BY PROJECT RELEASE SHK <br /> PENETRATIONS ARE LOCATED ON THE "8" SIDE OF <br /> THE DISPENSER. A 7-17-01 GARB. EVR Fllename <br /> Typical Under Dispenser PERMIT FacilltyPrJct <br /> Containment Sump BID 6100 <br /> 12 - - <br /> NOT TO SCALE: <br /> CONST, sheet nam- e <br /> AS-BUILT T K 3 - 3 <br /> G:\CLIENTS\ARCO\AR1402\TANKS\0495TK33.DWG <br />