Laserfiche WebLink
%NO <br />SWRCB, January 2002R Eg � Yqf C, <br />6. PIPING SUMP TESTING C�C' V7L_� <br />Test Method Developed By: - Sump Manufacturer ! J Industry Standard X Professional Epg(nger 2015 <br />-Other(Specify) AA II''KK 1I <br />Test Method Used: Pressure F� Vacuum X Hydrp�liYCiRONMENT <br />❑ Other (Specify) E�taYeV1r. <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump#1-91 Sump 42Diesel <br />Equipment Resolution: .002 <br />Sump Sump# <br />Sump Diameter: <br />46" <br />40" <br />46" <br />Sump Depth: <br />42" <br />40" <br />42" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Product 13" <br />Product 12" <br />Product 12" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />23" <br />23" <br />23" <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Dry <br />Portion of Sump Tested' <br />Water Line 25" <br />Water Line 25" <br />Water Line 25" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Yes <br />Yes <br />Yes <br />Turbine shutdown response time <br />Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />Is system programmed for fail-safe <br />shutdown? <br />Yes <br />Yes <br />Yes <br />Was fail-safe verified to be <br />operational?' <br />No <br />No <br />No <br />Wait time between applying water <br />and starting test: <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />8:55 <br />9:05 <br />9:55 <br />Initial Reading (R,): <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />9:25 <br />9:35 <br />10:25 <br />Final Reading (Rr): <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading (RP -R,): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Yes <br />Was sensor properly replaced and <br />verified functional after testm ? <br />Yes <br />Yes <br />Yes <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />R <br />