My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4445
>
2300 - Underground Storage Tank Program
>
PR0231785
>
COMPLIANCE INFO 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:19 AM
Creation date
11/6/2018 10:18:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015
RECORD_ID
PR0231785
PE
2361
FACILITY_ID
FA0003994
FACILITY_NAME
PERSHING GAS FOR LESS
STREET_NUMBER
4445
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11018006
CURRENT_STATUS
01
SITE_LOCATION
4445 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PERSHING\4445\PR0231785\COMPLIANCE INFO\COMPLIANCE INFO 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2015
QuestysRecordDate
8/29/2016 4:45:37 PM
QuestysRecordID
3177600
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Page _ of <br />Test Method Developed By: C UDC Manufacturer C Industry Standard X P <br />❑ Other (Spec) <br />Test Method Used: 71 Pressure ❑ Vacuum X Hydrostats <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />UDC #1&2 UDC#3&4 <br />Equipment Resolut,014 <br />UDC#5&6 <br />UDC# <br />UDC Manufacturer: <br />Bravo <br />Bravo <br />Bravo <br />UDC Material: <br />Coated Steel <br />Coated Steel <br />Coated Steel <br />UDC Depth: <br />8" <br />8" <br />8" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Enters from bottom <br />Enters from bottom <br />Enters from bottom <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Enters from bottom <br />Enters from bottom <br />Enters from bottom <br />Condition of UDC prior to <br />testing: <br />Dry <br />Dry <br />Dry <br />Portion of UDC Tested <br />Water Level 7" <br />Water Level 7" <br />Water Level 7" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />No <br />No <br />No <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />is system programmed for fail- <br />safe shutdown?* <br />Yes <br />Yes <br />Yes <br />Was fail-safe verified to be <br />operational?* <br />No <br />No <br />No <br />Wait time between applying <br />water and starting test <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />10:00 <br />10:05 <br />10:10 <br />Initial Reading (R,): <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />10:30 <br />10:35 <br />10:40 <br />Final Reading (Rr): <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Chane in Reading RF -R,): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30Minutes <br />TestResult: <br />Pass <br />Pass <br />Pass <br />Was sensor removed for testin ? <br />No <br />No <br />No <br />Was sensor properly replaced and <br />verified functional after testing? <br />N/A <br />N/A <br />N/A <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.