Laserfiche WebLink
This section must be completed if in -lank gauging equipment is used to perform leak detection moniloring. <br />Complete the following checklist: <br />® <br />Yes <br />❑ <br />No' <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® <br />Yes <br />❑ <br />No` <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® <br />Yes <br />❑ <br />No` <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />® <br />Yes <br />❑ <br />No' <br />Were all probes reinstalled property? <br />® <br />Yes <br />❑ <br />No" <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />` In Section H, below, describe how and when these deficiencies were or will be corrected. <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />%n IM. tho rnllnw:nn rhnnLl ef. <br />® <br />Yes <br />❑ No` <br />For equipment startup or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ <br />NIA <br />Simulated leak rate: 0 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />® <br />Yes <br />❑ <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® <br />Yes <br />❑ <br />No` <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />No" <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />® <br />Yes <br />❑ <br />No` <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />NIA <br />® <br />Yes <br />❑ <br />No` <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />NIA <br />® <br />Yes <br />❑ <br />No` <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />NIA <br />® <br />Yes <br />❑ <br />No" I <br />Were all items en the equipment manufacturer's maintenance checklist completed? <br />` In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />