Laserfiche WebLink
M Monitoring System Certification <br />UST Monitoring Site Plan <br />Site Address: — PERSHING GAS 4446 NORTH PERSHING AVENUE STOCKTON CA 96207 <br />KEY <br />A = ANNULAR <br />F= FILLS <br />T = TURBINE <br />P = PROBE <br />V= VAPOR <br />X � SUMP SENSOR <br />L = LD <br />M = Manway <br />B = Brine Sensor <br />I = Smart Sensor <br />S = STP <br />C = Floats & Chains <br />*PIPING * <br />(ARROWS) <br />Drawing of piping exit <br />of sump and UDC's. <br />No underground <br />drawing is accurate, we <br />cannot speculate blue <br />prints. <br />Rosemarie <br />E– E Stop . . . . . . . . . I . I . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />RUL. 0 0 STP <br />. . . . . . . . . . . . . . . . Co VCR LX <br />.......... ...... <br />.. ...... .... ... ........... — ...... <br />Date map was drawn: 1131118 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, ratherthan this page, with your MDnitcring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leek detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 <br />