Laserfiche WebLink
EMPLOYEE TRAINING PLAN <br /> Employees must be given this training before starting work, and refresher courses must be <br /> provided annually. Records must be kept to show when each station employee has been given <br /> his/her safety training. Use the following outline: <br /> I. FIRST TM24GS TO SNOW. <br /> A. M ICy pump sHuT-oFF: This turns off the turbine pumps that provide flow to <br /> the dispensers from the underground tanks. In case of a leak, shutting off the <br /> pumps will help to prevent spills. <br /> LUCATION: <br /> B. ELECTRICAL PANEL: The panel allows you to selectively cut off power to lights, <br /> signs, pumps, etc. The main switch kills all power at the site. <br /> LOCATION: <br /> C. WATER SHUT-OFF: The water shut-off may be necessary in some cases. <br /> LOCATION: <br /> D. FIRST AID KIT: <br /> LOCATION: <br /> E. FIRE EXTINGUISHERS: Use only on small fires that you can handle. Do not attempt <br /> to extinguish large fires on your own; call 9-1-1 for help. <br /> LOCATIONS: <br /> F. : In the form of crystals or cloth, absorbent can soak up small spills <br /> of gasoline, diesel fuel, or other petroleum products. Absorbent should be used <br /> rather than washing spills dawn a drain. In case of large spills, merely try to <br /> contain it; a vacuum truck should be used to clean up any large spills. <br /> LOCATION: <br /> G. NEARE'`S'I' MEDICAL FACILITY: Employees should know what facilities are available in <br /> case customers or other employees need medical attention. <br /> 1. NAME <br /> ALE= <br /> PHONE NUMBER: <br /> 2. NAME <br /> ADERESS: <br /> PHONE NUMBER: <br /> Page 9 of 10 <br />