Laserfiche WebLink
Phase H Site Assessment Workplan/Health and Safety :Plan October 1996 <br /> for the Lodi RaillMultimodal Station Project No. E168-1 <br /> SITE SPECIFIC HEALTH & SAFETY PLAN <br /> Dodi RaiL[Multimodal Station <br /> ' This form must be completed in a minimum of one (1) week prior to the start of work. It is <br /> the responsibility of the project engineer to complete all items. All project personnel must <br /> receive a copy of this form and familiarize themselves with its contents prior to the start of <br /> activities. <br /> 1. Site Name and Address: <br /> Lodi Rail/Multimodal Station Site <br /> Approximately 50 South Sacramento Street to 28 North Sacramento Street, <br /> Lodi, CA <br /> iThe Site is bounded by East Elm St. on the north, Southern Pacific Railroad on the east, East <br /> Oak St. on the south, and North and South Sacramento Street on the West (See Figure 1). <br /> 2. Site Personnel: <br /> Project Manager Carlos Espafia <br /> t Project En ineer/Geologist Patrick Fischer <br /> J g <br /> Stephen Harvey <br /> 1 Driller <br /> Helper <br /> 3. Site Description and Background <br /> See Site Workplan <br /> 4. List of Potential Chemical Contaminants: <br /> Contaminant Source Medium Anticipated <br /> Concentrations <br /> Fuel (gas/diesel) UST/Pipelines Soil/Air Unknown <br /> Waste oil Sumps/dumping Soil Unknown <br /> Solvents Sumps/dumping Soil/Air Unknown <br /> 1 <br /> V ESPANA GEOTECHNICAL CONSULTING <br />