Laserfiche WebLink
0 0 <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> <.' ?a Donna K.Heran,R.E.H.S. Unit Supervisors <br /> Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> J Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> • - •'P Manager Program Douglas W.Wilson,R.E.H.S. <br /> Qc;Fo �+` g g <br /> Laurie A.Cotulla,R.E.H.S. Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S.Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> January 13,2003 <br /> E.F. Kludt & Sons INC <br /> Attn: Stephan Kludt <br /> P.O. Box 166 <br /> Lodi CA 95241-0166 <br /> RE: E.F. Kludt& Sons INC <br /> 1126 E.Pine ST Lodi CA 95240 <br /> The permit to remove the existing trench line system and install double wall fiberglass piping at the above referenced <br /> location has been approved with the following conditions: <br /> Removal Conditions: <br /> 1. Contact the fire department for their permit requirements. <br /> 2. Samples must be taken and analyzed as stated on pages 4 and 5 of the permit application. <br /> 3. Per permit application, Cambria Environ Tech will perform the soil sampling and McCampbell Analytical will <br /> perform the analytical tests. <br /> 4. EHD must witness the soil sampling. Contact EHD to arrange this inspection appointment. <br /> Installation Conditions: <br /> 1. Contact the local fire department and San Joaquin Valley Air Pollution Control District for applicable permits. <br /> 2. A third parry certified tank integrity test must be performed and results received prior to scheduling the final <br /> inspection. <br /> 3. A third party certified piping line tightness test must be performed and results prior to scheduling the final <br /> inspection. <br /> 4. If automatic pump shut down is provided it must satisfy 2636(g)of California Code of Regulations(CCR). <br /> 5. All piping and connections shall bear a UL label. <br /> 6. All piping must slope to a containment sump with an audible and visual alarm. <br /> 7. All equipment in contact with backfill must have corrosion protection. <br /> 8. Overfill prevention must satisfy CCR 2635(b)(2). <br /> 9. Contact EHD for the following inspections: <br /> a. Primary piping <br /> b. Secondary piping <br /> c. Piping slope <br /> d. 24 hour lake test on dispenser pans and sumps <br /> e. Final inspection <br /> 10. Any changes in information or scope of work must be submitted to EHD prior to commencing work. <br /> 11. A final inspection must be performed prior to returning this station to operation. <br /> 12. Submit an As-Built plan to EHD at the time of the final inspection.Note: A final inspection will not be <br /> performed unless the as-builts are submitted. <br /> 13. Contact Dina Abate EHS at(209)468-3468 to arrange all inspections. Allow 48 hour notice for all <br /> inspections. <br /> 14. Permit expires April 13,2003. Note: If an extension to the expiration date is required a request must be <br /> received in writing to this office prior to the expiration date. <br />