Laserfiche WebLink
D. Results of Testing/Servicinge <br /> Software Version Installed: <br /> Complete the following checklist: <br /> Yes ❑ No* is the audible alarm operational'? <br /> Yes ❑ No* is the visual alarm operational? <br /> Yes ❑ No* Were al sensors visually inspected, functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> C. NIA operational? <br /> ❑ Yes ❑ No* For pressurized piping systems. does the turbine automatically shut down if the piping secondary containment <br /> ;f N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shat-down? (Cheek all Orn(apply) U/Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; ❑ No. <br /> ❑ Yes ❑ No* For tank systems that nrtilize Il+e monitoring system as the primary tank overfill warning device (i.e. no <br /> 0 NIA mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating ro erl ? If so, at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? if yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer manic and model for all replacement parts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all char apply)❑ <br /> Product; ❑Water. If yes.describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* is all monitoring a ui mentoperational er manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments <br /> 03!01 <br /> Page 2 of 3 <br />