My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:17 AM
Creation date
11/6/2018 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PINE\1126\PR0231364\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
9/7/2017 9:00:20 PM
QuestysRecordID
3628601
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gatiging /Sl R 1?gllil"11e111: U ('lieck this box if tank ganging is used only for inventory control. <br /> A)�( 'heck this hnx if no lank gauging or SIR equipment is installed. <br /> This section must be completed if ill-lank gailgittg e(luilmtcttt is used to perf«rni leak detection monitoring. <br /> Complete the following cliecklist: <br /> EW <br /> * Has Eiji input wiring been irispecied for proper entry and let-Mination, including testing for ground faults? <br /> Were all tank gauging probes visually inspected for damnge and residue htlilclup? <br /> Was accuracy of systole,piodliCt icvcl ran(1inls tested? --- — <br /> Was accuracy of system water level readings tested? <br /> Were all probes reinstalled properly'? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or~vitt be corrected. <br /> G. Line Leak Detectors (LLU): U ( 'lit-A this hox il'l JPs are not itistalleci. <br /> Complete the tollnwing checklist: <br /> Yes Q No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ NIA (Cheek all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> Yes El No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Y <br /> LJ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs, does the LID restrict product flow if it detects a leak? <br /> ❑ NIA _ <br /> ❑ Yes ❑ No* For electronic LLDs,does the luibine automatically shut off if the LLD detects a leak? <br /> NIA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turhine automatically shut off if any portion of the monitoring system is disabled <br /> Jl ( NIA or disconnected? <br /> ❑ Yes D No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> NIA malfunctions or fails a lc.-;I? <br /> ❑ Yes ❑ No* For electronic LLDs, have all arc cssihle wiring connections been visually inspected? <br /> Lk NIA <br /> Yes ❑ No* Were all items on the egtiilrnierrl manufacturer's maintenance checklist completed? <br /> "In the Section H, below, describe bow and wile" these deficiencies were or will be corrected. <br /> R. Comments; - - - --=------- <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.